16 results on '"Cekić, Zoran"'
Search Results
2. MODELING OF PARTICULATE MATTER CONCENTRATIONS ON A CONSTRUCTION SITE BASED ON IoT MONITORING SYSTEM.
- Author
-
MILIVOJEVIĆ, Lazar B., MRAZOVAC-KURILIĆ, Sanja M., ŠUNJEVIĆ, Miljan Z., BOŽILOVIĆ, Zvonimir S., GOLUBOVIĆ-MATIĆ, Darinka B., and CEKIĆ, Zoran D.
- Subjects
BUILDING sites ,ARTIFICIAL neural networks ,AIR pollution ,DUST ,DISTRIBUTED sensors ,INTERNET of things ,SENSOR networks ,PARTICULATE matter - Abstract
An Internet of things (IoT) based system framework integrating a distributed sensor network was implemented to collect real-time data at a construction site. Various sensors were utilized to gather data concerning particulate matter (PM
2.5 and PM10 concentrations) as well as meteorological parameters - wind speed, humidity, pressure, and temperature. The real-time measurements results provide an overview of air pollution levels at the construction site, revealing its association with earth excavation work, the primary construction activity. This connection allows for better management aimed at reducing concentrations of suspended particles. Through on-site monitoring of two pollutant concentrations, this study identified that the dust levels resulting from excavation activities were relatively high. It can be concluded that earth excavation significantly impacts air quality in the construction area. While exploring the primary factors influencing construction dust concentrations, the correlations indicate that these concentrations were not significantly associated with meteorological factors. To predict PM2.5 and PM10 concentrations in the air using number of working machines and meteorological parameters as predictors, both multiple linear regression and artificial neural network models were applied. The artificial neural network model demonstrates better alignment with the measured air concentrations compared to the multiple linear regression model. The artificial neural network model demonstrated an R2 value of 0.674 for PM10 and 0.618 for PM2.5 , indicating a strong predictive capability. The aim of this research, through modeling PM2.5 and PM10 concentrations in the air at the construction site is to indicate importance of the topic, especially with respect to the health of the construction site workers. [ABSTRACT FROM AUTHOR]- Published
- 2024
- Full Text
- View/download PDF
3. Global Perception of Sustainable Construction Project Risks
- Author
-
Rafindadi, Aminu Darda’u, Mikić, Miljan, Kovačić, Iva, and Cekić, Zoran
- Published
- 2014
- Full Text
- View/download PDF
4. Case-based reasoning and electromagnetism-like method in construction management
- Author
-
Kartelj, Aleksandar, Šurlan, Nebojša, and Cekić, Zoran
- Published
- 2014
- Full Text
- View/download PDF
5. Robust Estimation of Deformation from Observation Differences Using Some Evolutionary Optimisation Algorithms
- Author
-
Batilović, Mehmed, primary, Đurović, Radovan, additional, Sušić, Zoran, additional, Kanović, Željko, additional, and Cekić, Zoran, additional
- Published
- 2021
- Full Text
- View/download PDF
6. Disipacija mehaničke energije prelivnog mlaza pomoću suprotnog toka
- Author
-
Stevović, Svetlana, Božilović, Slavko, Cekić, Zoran, Marković, Ljubo, Alghwail, Amad.Deen Abdusalam S., Stevović, Svetlana, Božilović, Slavko, Cekić, Zoran, Marković, Ljubo, and Alghwail, Amad.Deen Abdusalam S.
- Abstract
Ova studija se bavi konceptom suprotnog toka kao metodom disipacije energije vode preko nagnutih površina. U ovom slučaju suprotan tok je razvijen da rasipa energiju vodenog mlaza preko sedlastog ogee preliva, čija je zadnja površina nagnuta pod određenim uglom. Suprotan mlaz, koji izlazi iz otvora na čvrstoj podlozi, transverzalno udara u glavni tok koji pada preko preliva, i kao rezultat, dolazi do formiranja prinudnog hidrauličkog skoka. Mlaz koji izlazi iz otvora snadbeva se sa uzvodne strane i samim tim, oba toka, glavni i suprotni, nalaze se na istoj visini. Rad se bavi proučavanjem parametara kao što su: položaj, pravac, širina otvora kao i Froude-ovog broja i njihovim uticajem na osobine prinudnog skoka, bilo savršenog ili potopljenog. Problem je razmatran analitički i eksperimentalno. U analitičkom delu, razvijene su jednačine za odnos konjugovanih dubina, gubitak energije za prinudan hidraulički skok i granični uslov za savršen slobodan hidraulički skok. Tačnost ovih izraza je proverena putem eksperimentalnih merenja zasnovanih na fizičkom modelu predloženog disipatora. U eksperimentalnom delu, ispitivan je uticaj glavnih parametara na osobine prinudnog skoka, bilo savršenog ili potopljenog. Rezultati su pokazali da razvijeni disipator poseduje veliku efikasnost, s obzirom da u značajnoj meri smanjuje dužinu “umirujućeg” basena što u krajnjem, smanjuje troškove izgradnje samekonstrukcijkonstrukcije. Studija je upotpunjena praktičnim detaljima disipatora kao što su: dimenzije ukrštenog toka, položaj, širina i pravac otvora, a koji su važni za njegovu praktičnu primenu.
- Published
- 2018
7. Unapređenje performansi energetski efikasnog projektovanja eksperimentalnim i simulacionim istraživanjima PCM materijala i ugradnjom fotonaponskih sistema u omotače građevinskih objekata
- Author
-
Mijuca, Dubravka, Božilović, Slavko, Cekić, Zoran, Koprivica, Suzana, Sun, Xiaoqin, Jovanović, Jovana Đ., Mijuca, Dubravka, Božilović, Slavko, Cekić, Zoran, Koprivica, Suzana, Sun, Xiaoqin, and Jovanović, Jovana Đ.
- Abstract
Jedan od najvećih problema svijeta danas je pitanje energije. Inženjeri i naučnici istražuju najefikasnije načine proizvodnje, transporta i potrošnje energije. Građevinarstvo je jedna od oblasti gdje se najviše energije troši. Istraživanja u smislu racionalizacije energetske potrošnje u gradjevinarstvu su su izuzetno aktuelna i opravdana. Oko 40 % svjetske potrošnje energije otpada na građevinske objekte (rezidencijalni i nerezidencijalni- uslužni sektor) odn. za grijanje, hlađenje, rasvjetu, kućne aparate, itd. Sem toga ovaj dio utrošene energije ima značajan uticaj na okolinu proizvodeći skoro 25% globalne emisije CO2. Stoga je povećanje energetske efikasnosti građevinskih objekata jedan od primarnih zadataka. Jedan od predmeta istraživanja u doktorskoj disertaciji je ocjena nivoa energetske efikasnosti pri primjeni fotonaponskih (PV-PhotoVoltage) modula u Trombovom zidu (takozvani PV-Trombov zid) sa aspekta proizvodnje električne energije, tj. stepena iskorišćenja PV modula. U tom smislu određena je srednja godišnja i srednja mjesečna vrednost generisane električne energije od strane PV modula za različite uglove nagiba PV modula prema tlu, odn. identifikovani su optimalni uglovi nagiba pri kojima je maksimalna generisana električna energija od strane PV modula. Električna energija proizvedena putem PV panela, integrisanih u PV-Trombov zid, analizirana je putem System Advisor Model (SAM) softvera. Izborom lokacija panela, tj. gradova (Podgorica i Changsha), gdje je PV lociran, izabrani su automatski i fajlovi sa realnim parametrima klimatskih, vremenskih prilika za tu lokaciju (solarna iradijacija, temperatura ambijenta, vjetar, itd.) kojima se datoteke SAM-a snabdijevaju u vremenskim sekvencama od 1h. Pri simulaciji i proračunu su uzeti u obzir i drugi relevantni podaci iz datoteka SAM-a koji se odnose na PV (konkretni izabrani tip PV modula, odn. panela, sa odgovarajućim kataloškim parametrima,uglovi nagiba PV, radne temperature PV modula, itd.). Zaključak je d
- Published
- 2017
8. Probabilistički normativi za planiranje u uslovima neizvesnosti
- Author
-
Milajić, Aleksandar, Dutina, Velimir, Cekić, Zoran, Khaled, Almayouf O., Milajić, Aleksandar, Dutina, Velimir, Cekić, Zoran, and Khaled, Almayouf O.
- Abstract
Poznato je da je upravljanje rizicima u građevinskim projektima veoma važan segment menadžmenta za obezbeđenje uspešnog okončanja projekta u pogledu trajanja, troškova, kvaliteta tadova, bezbednosti i ekoloških aspekata. Međutim, većina dosadašnjih istraživanja u ovoj oblasti bila je usmerena samo na pojedine aspekte upravljanja rizicima, bez primene sistematičnog holističkog pristupa u identifikaciji rizika, analizi verovatnoće njihovog pojavljivanja i uticaja na tok projekta. Kod građevinskih projekata je, zbog dugog trajanja procesa i rizika koji ga prate, često teško ili čak gotovo nemoguće tačno predvideti trajanje pojedinačnih aktivnosti i tvrditi da će određena aktivnost biti okončana baš onog dana kad je predviđeno planom gradnje. Rezultat ovoga su nepouzdani dinamički planovi gradnje. Pri planiranju građevinskih projekata koriste se različite metode, među kojima najčešće gantogrami, metod kritičnog puta (Critical Path Method, CPM) i PERT metod (Program Evaluation and Review Technique). Svaka od njih ima svoje prednosti, nedostatke i oblasti u kojima je najpodesnija za upotrebu, ali jedino su u PERT metodi prevaziđene teškoće u vezi s trajanjima aktivnosti kada za njih ne postoje pouzdani podaci. PERT metoda omogućava planeru da proceni najverovatnije trajanje projekta i verovatnoću da će projekat ili neki njegov deo biti okončan u određenom vremenskom roku. Iako donekle slična metodi kritičnog puta, PERT metoda za svaku aktivnost koristi tri procenjena vremena njenog trajanja – optimističko, pesimističko i očekivano trajanje. Međutim, bez odgovarajućih normativa, procena i predviđanje trajanja gradnje zasnivaće se isključivo na slobodnoj ličnoj proceni i/ili na iskustvu stečenom na sličnim projektima u prošlosti. Ova disertacija se bavi primenom naučnog pristupa u razvijanju savremenih probabilističkih normativa koji su primenljivi za PERT metod.
- Published
- 2017
9. Global Perception of Sustainable Construction Project Risks
- Author
-
Rafindadi, Aminu Darda'u, Mikić, Miljan, Kovacić, Iva, Cekić, Zoran, Rafindadi, Aminu Darda'u, Mikić, Miljan, Kovacić, Iva, and Cekić, Zoran
- Abstract
Sustainability goals move projects away from narrowly focused traditional management oriented ambitions of time, cost and quality, giving attention to economic, environmental and social impacts of construction projects. The recent literature identifies the critical project delivery attributes influencing sustainable building and infrastructure project outcomes as: trust and collaboration between key project participants, their commitment to sustainability, their early involvement and contract conditions. This paper presents results of the still ongoing study which is in relatively under-researched area and examines the global perception of sustainable Construction Project Risks. The survey goals were to compare different stakeholders' evaluation of risks and stakeholders influence on project success. Risk was defined as an implication of uncertainty that could potentially impact project goals, either positively or negatively. Opposite of hypothesis, which was that different stakeholders will prioritize risk sources differently, the findings suggest there is no significant discrepancy between the perceptions of different stakeholders about the sustainable project risks.
- Published
- 2014
10. Poglavlje VIII – „Razvoj, proizvodnja i korišćenje vatrostalnih materijala“
- Author
-
Nikolić, Ilija, Nikolić, Ilija, Cekić, Zoran, Pavlović, Ljubica, Terzić, Anja, Nikolić, Ilija, Nikolić, Ilija, Cekić, Zoran, Pavlović, Ljubica, and Terzić, Anja
- Published
- 2009
11. Communications and forum:Case-based reasoning model applied as a decision support for construction projects
- Author
-
Ćirović, Goran, Cekić, Zoran, Ćirović, Goran, and Cekić, Zoran
- Abstract
Discusses a solution to a growing need for Industry Knowledge Base in the construction industry. This paper shows a Case Based Reasoning model based on the Rough Sets Theory and applied as a decision support in the preliminary design phase of construction projects.
- Published
- 2002
12. Communications and forum
- Author
-
Ćirović, Goran, primary and Cekić, Zoran, additional
- Published
- 2002
- Full Text
- View/download PDF
13. Robust Estimation of Deformation from Observation Differences Using Some Evolutionary Optimisation Algorithms.
- Author
-
Batilović, Mehmed, Đurović, Radovan, Sušić, Zoran, Kanović, Željko, and Cekić, Zoran
- Subjects
MATHEMATICAL optimization ,SIMILARITY transformations ,MONTE Carlo method ,EVOLUTIONARY algorithms ,SURFACE of the earth ,ENGINEERING mathematics - Abstract
In this paper, an original modification of the generalised robust estimation of deformation from observation differences (GREDOD) method is presented with the application of two evolutionary optimisation algorithms, the genetic algorithm (GA) and generalised particle swarm optimisation (GPSO), in the procedure of robust estimation of the displacement vector. The iterative reweighted least-squares (IRLS) method is traditionally used to perform robust estimation of the displacement vector, i.e., to determine the optimal datum solution of the displacement vector. In order to overcome the main flaw of the IRLS method, namely, the inability to determine the global optimal datum solution of the displacement vector if displaced points appear in the set of datum network points, the application of the GA and GPSO algorithms, which are powerful global optimisation techniques, is proposed for the robust estimation of the displacement vector. A thorough and comprehensive experimental analysis of the proposed modification of the GREDOD method was conducted based on Monte Carlo simulations with the application of the mean success rate (MSR). A comparative analysis of the traditional approach using IRLS, the proposed modification based on the GA and GPSO algorithms and one recent modification of the iterative weighted similarity transformation (IWST) method based on evolutionary optimisation techniques is also presented. The obtained results confirmed the quality and practical usefulness of the presented modification of the GREDOD method, since it increased the overall efficiency by about 18% and can provide more reliable results for projects dealing with the deformation analysis of engineering facilities and parts of the Earth's crust surface. [ABSTRACT FROM AUTHOR]
- Published
- 2022
- Full Text
- View/download PDF
14. Disipacija mehaničke energije prelivnog mlaza pomoću suprotnog toka
- Author
-
Alghwail, Amad.Deen Abdusalam S., Stevović, Svetlana, Božilović, Slavko, Cekić, Zoran, and Marković, Ljubo
- Subjects
dužina “umirujućeg” basena ,disipator suprotnog toka ,lokalno spiranje ,savršen hidraulični skok ,građevinarstvo ,disipacija energije - Abstract
Ova studija se bavi konceptom suprotnog toka kao metodom disipacije energije vode preko nagnutih površina. U ovom slučaju suprotan tok je razvijen da rasipa energiju vodenog mlaza preko sedlastog ogee preliva, čija je zadnja površina nagnuta pod određenim uglom. Suprotan mlaz, koji izlazi iz otvora na čvrstoj podlozi, transverzalno udara u glavni tok koji pada preko preliva, i kao rezultat, dolazi do formiranja prinudnog hidrauličkog skoka. Mlaz koji izlazi iz otvora snadbeva se sa uzvodne strane i samim tim, oba toka, glavni i suprotni, nalaze se na istoj visini. Rad se bavi proučavanjem parametara kao što su: položaj, pravac, širina otvora kao i Froude-ovog broja i njihovim uticajem na osobine prinudnog skoka, bilo savršenog ili potopljenog. Problem je razmatran analitički i eksperimentalno. U analitičkom delu, razvijene su jednačine za odnos konjugovanih dubina, gubitak energije za prinudan hidraulički skok i granični uslov za savršen slobodan hidraulički skok. Tačnost ovih izraza je proverena putem eksperimentalnih merenja zasnovanih na fizičkom modelu predloženog disipatora. U eksperimentalnom delu, ispitivan je uticaj glavnih parametara na osobine prinudnog skoka, bilo savršenog ili potopljenog. Rezultati su pokazali da razvijeni disipator poseduje veliku efikasnost, s obzirom da u značajnoj meri smanjuje dužinu “umirujućeg” basena što u krajnjem, smanjuje troškove izgradnje samekonstrukcijkonstrukcije. Studija je upotpunjena praktičnim detaljima disipatora kao što su: dimenzije ukrštenog toka, položaj, širina i pravac otvora, a koji su važni za njegovu praktičnu primenu.
- Published
- 2018
15. Unapređenje performansi energetski efikasnog projektovanja eksperimentalnim i simulacionim istraživanjima PCM materijala i ugradnjom fotonaponskih sistema u omotače građevinskih objekata
- Author
-
Jovanović, Jovana Đ., Mijuca, Dubravka, Božilović, Slavko, Cekić, Zoran, Koprivica, Suzana, and Sun, Xiaoqin
- Subjects
PCM materijali ,Energetska efikasnost ,fotonaponski moduli - Abstract
Jedan od najvećih problema svijeta danas je pitanje energije. Inženjeri i naučnici istražuju najefikasnije načine proizvodnje, transporta i potrošnje energije. Građevinarstvo je jedna od oblasti gdje se najviše energije troši. Istraživanja u smislu racionalizacije energetske potrošnje u gradjevinarstvu su su izuzetno aktuelna i opravdana. Oko 40 % svjetske potrošnje energije otpada na građevinske objekte (rezidencijalni i nerezidencijalni- uslužni sektor) odn. za grijanje, hlađenje, rasvjetu, kućne aparate, itd. Sem toga ovaj dio utrošene energije ima značajan uticaj na okolinu proizvodeći skoro 25% globalne emisije CO2. Stoga je povećanje energetske efikasnosti građevinskih objekata jedan od primarnih zadataka. Jedan od predmeta istraživanja u doktorskoj disertaciji je ocjena nivoa energetske efikasnosti pri primjeni fotonaponskih (PV-PhotoVoltage) modula u Trombovom zidu (takozvani PV-Trombov zid) sa aspekta proizvodnje električne energije, tj. stepena iskorišćenja PV modula. U tom smislu određena je srednja godišnja i srednja mjesečna vrednost generisane električne energije od strane PV modula za različite uglove nagiba PV modula prema tlu, odn. identifikovani su optimalni uglovi nagiba pri kojima je maksimalna generisana električna energija od strane PV modula. Električna energija proizvedena putem PV panela, integrisanih u PV-Trombov zid, analizirana je putem System Advisor Model (SAM) softvera. Izborom lokacija panela, tj. gradova (Podgorica i Changsha), gdje je PV lociran, izabrani su automatski i fajlovi sa realnim parametrima klimatskih, vremenskih prilika za tu lokaciju (solarna iradijacija, temperatura ambijenta, vjetar, itd.) kojima se datoteke SAM-a snabdijevaju u vremenskim sekvencama od 1h. Pri simulaciji i proračunu su uzeti u obzir i drugi relevantni podaci iz datoteka SAM-a koji se odnose na PV (konkretni izabrani tip PV modula, odn. panela, sa odgovarajućim kataloškim parametrima,uglovi nagiba PV, radne temperature PV modula, itd.). Zaključak je da je sa aspekta veće proizvodnje električne energije PV panela, korisnije i ekonomski isplativije instalirati ga ne u Trombovom zidu, nego na drugom mjestu van Trombovog zida, obezbjeđujući optimalan ugao nagiba. Odnosno, inkorporiranje PV modula u omotač Trombovo zida, degradira+ stepen korisnosti PV modula. Drugi predmet istraživanja se odnosi na istraživanja primjene, ugradnje PCM(Phase Change Material - fazno-promjenljivi materijali, tj. materijali koji mijenjaju agregatno stanje) u omotače građevinskih objekata radi poboljšanja energetske efikasnosti stambenih objekata, tj. redukcije grijanja i hlađenja, odn. poboljšanja toplotnih performansi i smanjenja energetske potrošnje unutar stambenih objekata. Primjenom ovih materijala povećava se toplotni kapacitet, tj. sposobnost skladištenja toplote, čak do 14 puta više po jedinici mase od konvencionalnih materijala. Redukcija uključenja dodatnih izvora za zagrijavanje i hlađenje, da bi se temperatura održavala u zoni temperaturnog komfora, vrši se zahvaljujući sposobnosti PCM materijala da akumuliraju latentnu toplotu tokom procesa topljenja i otpuštaju toplotu tokom procesa solidifikacije. Eksperimentalna istraživanja su obuhvatila određivanje optimalnih pozicija izolacionih slojeva sa PCM materijalom (PCM kuglicama) u omotačima građevinskih objekata, tj. pozicija u kojima je maksimalan njihov učinak. Takav učinak podrazumijeva optimalnu regulaciju temperature prostorije u smislu postizanja temperaturnog komfora, uz redukciju upotrebe dodatnih sistema za grijanje i hlađenje. Eksperimentalna istraživanja su sprovedena u laboratoriji Univerziteta za nauku i tehnologiju, u Changsha, Kina. Radi ispitivanja prenosa toplote i njihovog uticaja na fluktuacije temperatura korišćena su kao uzorci tri gipsana zida sa odgovarajućom mjernom instrumentacijom korišćenom u toku eksperimenta. Eksperimenti su vršeni za izvor toplote sa konstantnim i tranzijentnim toplotnim fluksom. Pozicije slojeva sa PCM kuglicama i šupljinama su simultano varirane i dovođene u istu poziciju u odnosu na grejnu foliju, radi poređenja i nalaženja njihovih optimalnih pozicija u kojima je maksimalan njihov učinak, tj. maksimalna redukcija temperature u toku dana, a maksimalni porast temperature u toku noći. Dobijeni rezultati i analiza treba da doprinesu unapređenju efikasnog projektovanja i energetskih performansi izolacionog zida, tj. omotača zgrade sa ugrađenim PCM materijalima.
- Published
- 2017
16. Probabilistički normativi za planiranje u uslovima neizvesnosti
- Author
-
Khaled, Almayouf O., Milajić, Aleksandar, Dutina, Velimir, and Cekić, Zoran
- Subjects
Menadžment i biznis ,normative ,upravljanje rizikom ,PERT ,probabilistički normativi - Abstract
Poznato je da je upravljanje rizicima u građevinskim projektima veoma važan segment menadžmenta za obezbeđenje uspešnog okončanja projekta u pogledu trajanja, troškova, kvaliteta tadova, bezbednosti i ekoloških aspekata. Međutim, većina dosadašnjih istraživanja u ovoj oblasti bila je usmerena samo na pojedine aspekte upravljanja rizicima, bez primene sistematičnog holističkog pristupa u identifikaciji rizika, analizi verovatnoće njihovog pojavljivanja i uticaja na tok projekta. Kod građevinskih projekata je, zbog dugog trajanja procesa i rizika koji ga prate, često teško ili čak gotovo nemoguće tačno predvideti trajanje pojedinačnih aktivnosti i tvrditi da će određena aktivnost biti okončana baš onog dana kad je predviđeno planom gradnje. Rezultat ovoga su nepouzdani dinamički planovi gradnje. Pri planiranju građevinskih projekata koriste se različite metode, među kojima najčešće gantogrami, metod kritičnog puta (Critical Path Method, CPM) i PERT metod (Program Evaluation and Review Technique). Svaka od njih ima svoje prednosti, nedostatke i oblasti u kojima je najpodesnija za upotrebu, ali jedino su u PERT metodi prevaziđene teškoće u vezi s trajanjima aktivnosti kada za njih ne postoje pouzdani podaci. PERT metoda omogućava planeru da proceni najverovatnije trajanje projekta i verovatnoću da će projekat ili neki njegov deo biti okončan u određenom vremenskom roku. Iako donekle slična metodi kritičnog puta, PERT metoda za svaku aktivnost koristi tri procenjena vremena njenog trajanja – optimističko, pesimističko i očekivano trajanje. Međutim, bez odgovarajućih normativa, procena i predviđanje trajanja gradnje zasnivaće se isključivo na slobodnoj ličnoj proceni i/ili na iskustvu stečenom na sličnim projektima u prošlosti. Ova disertacija se bavi primenom naučnog pristupa u razvijanju savremenih probabilističkih normativa koji su primenljivi za PERT metod.
- Published
- 2017
Catalog
Discovery Service for Jio Institute Digital Library
For full access to our library's resources, please sign in.