Search

Your search keyword '"CONSTRUCTION management"' showing total 2,332 results

Search Constraints

Start Over You searched for: Descriptor "CONSTRUCTION management" Remove constraint Descriptor: "CONSTRUCTION management"
2,332 results on '"CONSTRUCTION management"'

Search Results

1. The importance of the synergy between BIM and lean in the construction sector: A systematic literature review.

2. A qualitative study and analysis of claim problems in Indian construction industry.

3. Environmental changes and the first Olympic Winter Games. Infrastructure projects for 'Chamonix 1924'.

4. Blockchain Impact on Construction Quality Management and Its Adoption Analysis: A Game Theory–Based Method.

5. Framework of Digital Lean Construction and Implementation of Its Management Platform for the Construction Phase.

6. Comparative Analysis of Project Risks across Construction Sectors.

7. Multicriterion Decision-Support Model for Selecting the Appropriate Delivery Method in Sustainable Construction Projects.

8. Research on the evolutionary control of unsafe behavior of construction personnel based on multi-field coupled-homogeneous analysis model.

9. Small Left Ventricular Size Is a Risk Factor for Recurrent Pericardial Effusion after Percutaneous Drainage.

10. Information Integration of Regulation Texts and Tables for Automated Construction Safety Knowledge Mapping.

11. Vision-Based Detection Method for Construction Site Monitoring by Integrating Data Augmentation and Semisupervised Learning.

12. A REVIEW OF AGENT-BASED MODELING IN CONSTRUCTION MANAGEMENT: AN ANALYTICAL FRAMEWORK BASED ON MULTIPLE OBJECTIVES.

13. Bauteilversuche Oberesslingen – Teil 1: Konzeption des Auftraggebers.

14. Geometric quality assessment of precast concrete (PC) elements based on 3D structural light scanning.

15. Multiuser Virtual Reality-Enabled Collaborative Heavy Lift Planning in Construction.

16. Duration Estimation of a Heavy Industrial Scaffolding Project: A Case Study.

17. Assessment of Critical Project Success Factors for Management of Pavement Construction Using the Delphi Approach.

18. Stepping It Up.

19. The application of building information modelling (BIM) for cost and time analysis: Bintang Bano Dam, West Sumbawa, Indonesia.

20. Investigating and analyzing the causes of accidents – A case study of multistorey residential building.

21. Scientific foundations of the system of technical operation of road-building machines.

22. Implementation of industrial revolution 4.0 toward successful practices of total quality management in the sustainable construction industry.

23. Some issues on information management system for construction raw materials.

24. Statistical analysis of COVID-19 influences on construction industry with material management: A questionnaire-based approach.

25. The conceptual review on use of hollow concrete blocks in RC design.

26. Development of a safety management program for the construction industry of Nepal.

27. Public procurement factors affecting Iraqi contract management.

28. outside the box.

29. BIM 轻量化技术在水利工程中的应用.

30. Navigating the Ethical Discourse in Construction: A State-of-the-Art Review of Relevant Literature.

31. Unrealistic Project Goals: Detection and Modification.

32. Navigating the Ethical Discourse in Construction: A State-of-the-Art Review of Relevant Literature.

33. Unrealistic Project Goals: Detection and Modification.

34. Reviewers.

35. 干扰情形下重复性项目快速修复策略模型与算法.

37. Crisis communication in construction: Organizational strategies for worksite fatalities.

38. Allostructions and stancetaking: a corpus study of the German discourse management constructions Wo/wenn wir gerade/schon dabei sind.

39. Model projection relative to submetamodeling dimensions: A form of submodel circumscribing.

40. DInSAR Multi-Temporal Analysis for the Characterization of Ground Deformations Related to Tectonic Processes in the Region of Bucaramanga, Colombia.

41. STAE‐YOLO: Intelligent detection algorithm for risk management of construction machinery intrusion on transmission lines based on visual perception.

42. Apply EZStrobe to simulate the finishing work for reducing construction process waste.

43. Transforming Construction Management in Peru: The Role of BIM in Innovation and Efficiency.

44. Development and consideration of Chinese super-large diameter shield tunnel.

45. Analyzing the Big Room concept through a case study.

46. Improve the Bi-LSTM Model of University Financial Information Management Platform Construction.

47. Maturity evaluation of real-name management for construction enterprise workers based on PMMM model and AHP algorithm.

48. Construction Waste Management in Croatia.

49. A Systematic Review of the Project Management Information Systems in Different Types of Construction Projects.

50. Management of Household-Generated Construction and Demolition Waste: Circularity Principles and the Attitude of Latvian Residents.

Catalog

Books, media, physical & digital resources