Search

Your search keyword '"Boldrin, M"' showing total 345 results

Search Constraints

Start Over You searched for: Author "Boldrin, M" Remove constraint Author: "Boldrin, M"
345 results on '"Boldrin, M"'

Search Results

1. Near-room-temperature ferrimagnetism and half-metallicity in disordered Ca1.5La0.5MnRuO6

2. Integration studies of RF solid-state generators in the electrical system of NBTF experiments and ITER HNB

3. Lessons learned after three years of SPIDER operation and the first MITICA integrated tests

4. Structural transitions and spontaneous exchange bias in La2-xBaxCoMnO6 series

6. Tuning the spontaneous exchange bias effect with Ba to Sr partial substitution in La$_{1.5}$(Sr$_{0.5-x}$Ba$_{x}$)CoMnO$_{6}$

7. Griffiths phase and spontaneous exchange bias in La$_{1.5}$Sr$_{0.5}$CoMn$_{0.5}$Fe$_{0.5}$O$_{6}$

8. The spontaneous exchange bias effect on La$_{1.5}$Ba$_{0.5}$CoMnO$_{6}$

9. Status of SPIDER beam source after the first 3.5 years of operation

12. Optimizing the ITER NBI ion source by dedicated RF driver test stand

13. On the road to ITER NBIs: SPIDER improvement after first operation and MITICA construction progress

14. Highlights of recent SPIDER results and improvements

15. SPIDER, the Negative Ion Source Prototype for ITER: Overview of Operations and Cesium Injection

16. Lessons learned after three years of SPIDER operation and the first MITICA integrated tests

17. SPIDER in the roadmap of the ITER neutral beams

19. Spider beam source ready for operation

20. Corrigendum to “Status of SPIDER beam source after the first 3.5 years of operation” [Fusion Engineering and Design, Volume 192, July 2023, 113831]

21. Highlights of recent SPIDER results and improvements

23. Lessons learned after three years of SPIDER operation and the first MITICA integrated tests

24. A substantial step forward in the realization of the ITER HNB system: The ITER NBI Test Facility

26. Cell Therapy for Parkinson’s Disease: A Translational Approach to Assess the Role of Local and Systemic Immunosuppression

27. SPIDER, the Negative Ion Source Prototype for ITER: Overview of Operations and Cesium Injection

28. Strategy for Vacuum Insulation Tests of MITICA 1 MV Electrostatic Accelerator

29. On the road to ITER NBIs: SPIDER improvement after first operation and MITICA construction progress

30. First operations with caesium of the negative ion source SPIDER

31. Q4/2021 Quarterly report of the activities F4E-OFC-1007-01-01 - Years 2020 and 2021

33. Progress in the ITER neutral beam test facility

35. Preparation of the vacuum insulation tests on the MITICA 1 MV electrostatic Accelerator

37. The ITER full size plasma source device design

39. Q4/2020 - Quarterly report of the activities (PRIMA/MITICA)

40. Status of the upgrade of RFX-mod2

41. Achievement of DC 1 MV insulation in high-voltage power supply for ITER Neutral Beam Test Facility

42. SPIDER, the negative ion source prototype for ITER: first operations with caesium

43. First Operations with Caesium of the Negative Ion Source SPIDER

44. Work Programme 2021 Intermediate Report 3 ITER-RFX-NBTF-A-WP-2021

45. Work Programme 2021 Intermediate Report 1 ITER-RFX-NBTF-A-WP-2021

46. Completion of Assembly and High-Voltage Insulation Test of DC 1 MV Power Supply System for the ITER Neutral Beam Test Facility

47. Q2/2021 Quarterly report of the activities F4E-OFC

48. Work Programme 2020 Annual Activity Report ITER-RFX-NBTF-A-WP-2020

49. Radio Frequency Generators Based on Solid State Amplifiers for the NBTF and ITER projects

50. The Full-Voltage Operation of the Acceleration Grid Power Supply for SPIDER Experiment

Catalog

Books, media, physical & digital resources