1. Lessons learned after three years of SPIDER operation and the first MITICA integrated tests

5. Status of SPIDER beam source after the first 3.5 years of operation

6. RFX-mod2 diagnostic capability enhancements for the exploration of multi-magnetic-configurations

7. Optimizing the ITER NBI ion source by dedicated RF driver test stand

9. On the road to ITER NBIs: SPIDER improvement after first operation and MITICA construction progress

11. The new vessel complex for the RFX-mod2 experiment: An effective synergy between fusion research and technological development

12. Highlights of recent SPIDER results and improvements

13. SPIDER, the Negative Ion Source Prototype for ITER: Overview of Operations and Cesium Injection

14. Lessons learned after three years of SPIDER operation and the first MITICA integrated tests

16. Corrigendum to “Status of SPIDER beam source after the first 3.5 years of operation” [Fusion Engineering and Design, Volume 192, July 2023, 113831]

18. Highlights of recent SPIDER results and improvements

19. Lessons learned after three years of SPIDER operation and the first MITICA integrated tests

26. Design of a large nonevaporable getter pump for the full size ITER beam source prototype

28. Deficiency of Src family kinases p59/61hck and p58c-fgr results in defective adhesion-dependent neutrophil functions.

29. SPIDER, the Negative Ion Source Prototype for ITER: Overview of Operations and Cesium Injection

32. Strategy for Vacuum Insulation Tests of MITICA 1 MV Electrostatic Accelerator

33. On the road to ITER NBIs: SPIDER improvement after first operation and MITICA construction progress

40. Procurement and installation of permanent magnets in SPIDER Grounded Grid and Extraction Grid PBS: 53.SI.A1

41. Conceptual design of a cooling system for a new NEG vacuum pumps system of the SPIDER experiment

43. Preparation of the vacuum insulation tests on the MITICA 1 MV electrostatic Accelerator

47. Qualification strategy for a copper electrodeposition supplier PBS element: 53.SI.A1

48. Status of the upgrade of RFX-mod2

49. Activities on the task PROJ_11 «Procurement and installation of permanent magnets in SPIDER Grounded Grid» PBS : 53.SI.A1

50. SPIDER, the negative ion source prototype for ITER: first operations with caesium