Search

Your search keyword '"Albert Eddy Husin"' showing total 44 results

Search Constraints

Start Over You searched for: Author "Albert Eddy Husin" Remove constraint Author: "Albert Eddy Husin"
44 results on '"Albert Eddy Husin"'

Search Results

1. Blockchain-BIM: reducing cost in green retrofitting for sustainable construction development

2. Implementation of green river retrofitting concept using Blockchain-BIM for cost performance

3. Cost performance analysis of green chemical industrial buildings using blockchain-BIM

4. Zero Emission Guide by The Last Indonesian Minister Regulation of 2022 Uses Blockchain – BIM for Green Efficiency

5. Analysis of Key Factors for Successful Implementation of the Last Planner System to Improve Time Performance on Dam Projects

6. Key success factors analysis for improving cost performance of green retrofit infrastructure on the jetty project

7. Indonesia MICE green building project with value engineering and its influential factors: an SEM-PLS approach

8. Using PLS-SEM to analyze the criteria for the optimum cost of green MICE projects in Indonesia based on value engineering and lifecycle cost analysis

9. Infrastructure Construction Projects Scheduling Using Manual-Program Evaluation and Review Technique (M-PERT) Method. Case Study: Indonesian Sunda Strait Bridge

10. Key success factors for lean six sigma implementation on Light Rail Transit Station construction project

11. Influential factors in the application of the Lean Six Sigma and time-cost trade-off method in the construction of the ammunition warehouse

12. Value increase of jetty project based on system dynamics

13. Value engineering and lifecycle cost analysis to improve cost performance in green hospital project

14. Improving The Cost Performance of Mechanical Electrical And Plumbing (MEP) Works Buildings In Hotel Based on Building Information Modeling (BIM) 5D

15. Forecasting Demand on Mega Infrastructure Projects: Increasing Financial Feasibility

18. Performance Improvement of Box Girder Construction on Toll Road Projects based on M-PERT and VE

19. Optimization of M-PERT & BIM 5D to Minimize the Risk of Time Delay & Overrun in Stadium Project Structure Works: Key Success Factors

20. Analysis of Time Efficiency with CCPM Method and BIM in Construction Projects Construction of High-Rise Residential Building Basement

21. Implementation of Lean Six Sigma Method in High-Rise Residential Building Projects

22. Value Increase of Jetty Project Based on System Dynamics

23. Water Network Improvement Using Infrastructure Leakage Index and Geographic Information System

28. Key Success Factors for Critical Chain Project Management (CCPM) and 4D Building Information Modeling (BIM) for Improving Time Performance in Basement Work on 5 Layers of High-rise Residential Buildings in Indonesia

29. Improving The Cost Performance of Mechanical Electrical And Plumbing (MEP) Works Buildings In Hotel Based on Building Information Modeling (BIM) 5D

32. Key Success Factors of Line of Balance (LOB) And M-PERT Integration on The Development of Wastewater Treatment Plant

33. Optimum Haul Road Track Selection on Open Pit Coal Mine By Fuzzy Analytical Hierarchy Process (FAHP) Implementation

34. Key Success Factors Implementing BIM Based Quantity Take-off in Fit-Out Office Work using Relative Importance Index

36. Box Girder Construction on Toll Road Project use Manual Program Evaluation and Review Technique (M-PERT) and Value Engineering (VE) to Performance Cost and Time Improvement

37. Improvement of Cost Performance Based on Bim Quantity Take-off Hospital Structure Work

39. Analisis Optimasi Waktu Dan Biaya Dengan Metode Time Cost Trade Off Pada Proyek Gudang Amunisi

40. ANALISIS PEKERJAAN PONDASI BORED PILE, PILE CAP SERTA SECANT PILE BERBASIS AHP (ANALYTIC HIERARCHY PROCESS) PADA PROYEK BANGUNAN HUNIAN BERTINGKAT TINGGI

41. Peningkatan Kinerja Biaya Berbasis Value Engineering Pada Proyek Green Hospital

Catalog

Books, media, physical & digital resources