1,028 results on '"plutonium dioxide"'
Search Results
202. Calculation of the thermodynamic properties of fuel-vapor species from spectroscopic data
203. Environmental and radiological safety studies. Interaction of /sup 238/PuO/sub 2/ heat sources with terrestrial and aquatic environments. Progress report, July 1-September 30, 1980
204. Long-term exposure of /sup 238/PuO/sub 2/ to an arid terrestrial environment
205. Swelling and gas release in oxide fuels during fast transients (AWBA Development Program)
206. Space nuclear safety program. Progress report, January 1984
207. General-Purpose Heat Source development: safety test program. Postimpact evaluation, Design Iteration Test 2
208. Nuclear-fuel-cycle risk assessment: descriptions of representative non-reactor facilities, Sections 15-19
209. Mechanical behavior of fast reactor fuel pin cladding subjected to simulated overpower transients
210. Field test of the bulk-assay calorimeter
211. Light-Weight Radioisotope Heater Unit final safety analysis report (LWRHU-FSAR): Volume 1: A. Introduction and executive summary: B. Reference Design Document (RDD)
212. Environmental and radiological safety studies: interaction of /sup 238/PuO/sub 2/ heat sources with terrestrial and aquatic environments. Progress report, July 1-September 30, 1982
213. /sup 238/Pu fuel form processes. Monthly report, January--February 1978
214. Assessment of gel-sphere-pac fuel for fast breeder reactors
215. General-purpose heat source development. Phase II: conceptual designs. [/sup 238/PuO2]
216. Research and development program for selected components of mixed oxide fuel fabrication. Quarterly progress report for period ending June 30, 1977
217. Thermal outgassing of irradiated nuclear fuel: a literature review
218. General-Purpose Heat Source Development: Safety Test Program. Postimpact evaluation, Design Iteration Test 3
219. Fuel Thermal Expansion (FTHEXP). [BWR; PWR]
220. Organic Rankine Kilowatt Isotope Power System. Final phase I report
221. Monte Carlo analysis of Pu-H/sub 2/O and UO/sub 2/-PuO/sub 2/-H/sub 2/O critical assemblies with ENDF/B-IV data
222. /sup 238/Pu fuel form processes. Quarterly report, July-September 1982
223. Space Nuclear Safety Program. Monthly progress report, February 1984
224. Postirradiation examinations of fuel pins from the GCFR F-1 series of mixed-oxide fuel pins at 5. 5 at. % burnup
225. Comparison of carbide and oxide fuel-coolant interactions resulting from overpower transients. [LMFBR]
226. Quarterly technical progress report. Reactor safety, April--June 1978. [Sodium, fuel, and fission product aerosol behavior]
227. Alpha Fuels Environmental Test Facility impact gun
228. /sup 238/Pu fuel form processes. Savannah River Laboratory monthly report, May/June 1978
229. Light-Weight Radioisotope Heater Unit final safety analysis report (LWRHU-FSAR): Volume 2: Accident Model Document (AMD)
230. Procedures for PuO/sub 2/ field measurements with an HLNC-II
231. Materials measurement and accounting in an operating plutonium conversion and purification process. Phase I. Process modeling and simulation. [PUCSF code]
232. /sup 238/Pu fuel form processes. Monthly report, July--August 1978
233. Experimental investigations of /sup 238/Pu behavior in soil columns
234. Matpro--version 10: a handbook of materials properties for use in the analysis of light water reactor fuel rod behavior
235. MATPRO-Version 11: a handbook of materials properties for use in the analysis of light water reactor fuel rod behavior
236. General-Purpose Heat Source Safety Verification Test program: Edge-on flyer plate tests
237. Fuel-disruption experiments under high-ramp-rate heating conditions. [LMFBR]
238. Fuel cycle cost studies: fabrication, reprocessing, and refabrication of LWR, SSCR, HWR, LMFBR, and HTGR fuels
239. Space nuclear safety program: Progress report, July--September 1987
240. General-Purpose Heat Source Safety Verification Test series: SVT-7 through SVT-10
241. Space Nuclear Safety Program. Progress report, March 1984
242. Reactor safety. Quarterly technical progress report, October--December 1978. [Sodium, fuel, and fission product aerosol behavior]
243. Space nuclear safety program. Progress report, December 1982
244. Development of the CEPOD process for dissolving plutonium oxide and leaching plutonium from scrap or wastes. [Catalyzed Electrochemical Plutonium Oxide Dissolution (CEPOD)]
245. Space Nuclear Safety Program. Progress report, May 1984
246. Analytical techniques to reduce the number of physical standards needed for neutron coincidence counters
247. Problem statement: international safeguards for a light-water reactor fuels reprocessing plant
248. Compatibility of Pt-3008 with selected components of the selenide isotope generator system
249. Fuel vapor pressure (FVAPRS). [BWR; PWR]
250. Space nuclear safety and fuels program. Progress report, April 1981
Catalog
Books, media, physical & digital resources
Discovery Service for Jio Institute Digital Library
For full access to our library's resources, please sign in.