196 results on '"Thorndahl, L."'
Search Results
102. Run 290, 26 GeV/c, R1, 20 bunches, 5 hours, FP 26 working line and transverse feedback against the 9th, 10th, 8th and 11th modes
103. Memorandum
104. Run 387P, both rings, working lines FP, energy: 11 GeV/c
105. Damping Magnet trial during Run 22
106. Feedback experiments against the 9th mode of coherent oscillations of the stack
107. Run 376, 26FP, Ring 1, 29.10.73: Density dependence of e-p instability and RF-clearing experiment
108. Run 254 - 16 November 1972, Ring 2 - 22 GeV/c - 20 bunches: Shifts of $Q_{H}$ and $Q_{V}$ in a shaved stack
109. Run no. 13, IBS (Ionization Beam Scanner)
110. Run 377P, 379P, 380P and 387P, both rings, 31.10.73, 2, 3 and 8.11.73
111. Vertical Schottky scan in R2 at the end of run 366
112. Run 334, 22 GeV/c, 2 hours, 30.7.73: Observations with movable microwave pick-ups MMP 464 built for stochastic damping of vertical betatron oscillations
113. Feedback against vertical coherent instabilities (Ring 1, 20 bunches, Run 163)
114. Runs 322 P, 323 P, 324 P, 325 P and 328 P, 26 GeV/c: High intensity loss rates with 5 C and 3 C working lines
115. Equipe d’etude de la machine: Cibles pour la mesure des dimensions du faisceau
116. A note concerning multiturn injection experiments
117. Damping of vertical coherent oscillations in Ring 1 by feedback during Runs 59 and 62
118. A model measurement of the longitudinal coupling impedance presented by the clearing electrodes in the ISR
119. run 377P, both rings, 26 GeV/c, FP 26: Working lines at the end of 377P as measured with the Q diagram meter
120. Damping magnet trial with 20 bunches
121. Coupling Between Vertical and Horizontal Betatron Oscillations after Injection at FC 26. (R-1, Run 136)
122. Run 342, 26 GeV/c, 7.8.73: Trials with an automatic gain control system in the Q measuring equipment
123. Signals induced on a radial pick-up
124. Damping of vertical and horizontal coherent oscillations in Ring 1 by feedback during Runs 71, 72, 75 and 80
125. Run 361, 26 GeV/c, parasitic on K. Hübner's time, Large vertical betatron oscillations observed with vertical Schottky scans
126. Run 329 - 10 July 1973, Ring 1 - 26 GeV/c - 20 bunches: Changes of 5C26 with space charge
127. Damping of injection errors during Run 161 (Ring 1, 4 bunches)
128. The CPS Ionization Beam Scanner (IBS)
129. Run 246 - 30/31 October 1972, Ring 2 - 22 GeV/c - 20 bunches, Q-shift in a shaved stack
130. First trial of the ISR Damping Magnet
131. Q-jump pulser for transition experiments
132. Run 368 P, 22 GeV/c, R2, 5C 22: Vertical betatron oscillations observed with 65th mode Schottky Scans
133. Experimental verification of the Q-jump method for passing transition with dense beams
134. Vertical feedback in Ring 2 during Run 133
135. Transverse feedback in R1 on 3c26 working line - 5.5 hours, Run No. 303, 26 GeV, 20 b, 1.5.73
136. Instrumentation and beam diagnostics in the ISR
137. Run 299 - 26 GeV/c - 20 bunches - R1, Transverse feedback on 26 FP
138. Non-destructive proton beam profile scanners for the CPS, based on the ionization of residual gas in the beam vacuum chamber
139. Space charge potentials inside three different ISR chambers
140. Damping of transverse oscillations in the ISR
141. An analog model for space-charge affected betatron oscillations
142. Run 222, 1.9.72, 26 GeV, 20 bunches, R1, $Q_{V}$ Measurement by RF Knock-Out
143. Runs nos 15/16, Ionisation Beam Scanner - Results
144. Focusing and some other properties of the quadrupole mode in the circular disc-loaded waveguide
145. Measurement and Compensation of Space Charge Induced Q-Shifts in the CERN Intersecting Storage Rings (ISR).
146. CLIC - a compact and efficient high energy linear collider
147. Incorporating RF into a Muon Helical Cooling Channel
148. Stochastic cooling of a stored proton beam
149. Physics and technique of stochastic cooling
150. II. Experiments on stochastic cooling at cern
Catalog
Books, media, physical & digital resources
Discovery Service for Jio Institute Digital Library
For full access to our library's resources, please sign in.