Search

Your search keyword '"Laughton, C"' showing total 300 results

Search Constraints

Start Over You searched for: Author "Laughton, C" Remove constraint Author: "Laughton, C"
300 results on '"Laughton, C"'

Search Results

111. Design and construction of the cooling water intake tunnel system for Point Aconi generating station, Nova Scotia

112. Shotcrete in the construction of Pen-Y-Clip tunnel, North Wales

113. Face support for a large Mix-Shield in heterogeneous ground conditions

114. TBM drive management by use of computerized systems

115. Design, construction and performance of a 700-m ‘cover and cut’ tunnel in soft clay, Norway

116. Tunnels below waste disposal tips

117. Long-term measurements of loads on tunnel linings in overconsolidated clay

118. Non-destructive investigation of tunnels

119. EPB-shield tunnelling for the Taipei Metro, contract 201A

120. Machine tunnelling in the northwest of England

121. CEN safety standards for tunnelling machines and air locks

122. Gjøvik Olympic Mountain Hall, Norway

123. Water in TBM drives, Delivery Tunnel South, Lesotho Highlands Water Project

124. Construction of new escalator shaft and passageways at London Underground’s Waterloo Station

125. Environmental planning for the Massachusetts Water Resources Authority’s MetroWest water supply tunnel

126. Ground movement model validation at the Heathrow Express trial tunnel

127. Compensation grouting to limit settlements during tunnelling at Waterloo Station, London

128. Palais Bernheimer in Munich: tunnelling for parking space under a historic building

129. Limiting the damage to historic buildings due to tunnelling: experience at the Mansion House, London

130. Development and performance of tunnel-boring machines on Phase II of the London Water Ring Main

131. Open TBM tunnelling in complex geology for railroad in Sweden

132. Design and construction of caverns for an underground sewage treatment plant, Hong Kong

133. The Snake: a rock tunnel for storing combined sewage water, Stockholm

134. Two tunnel-boring machines for Lesotho: a design and case history

135. New St Clair River tunnel, Canada-USA

136. Application of NATM to design of underground stations in London Clay

137. Tunnelling on the Penzance and St. Ives sewerage scheme, Cornwall, England

138. Underground works on Third Nairobi Water Supply Project

139. Planning and design of tunnels for the Jubilee Line extension, London

140. Rock cutting with roadheaders

141. Tunnel design in the design and construct context—the Pergau experience, Malaysia

142. Increased productivity in construction of civil and mining tunnels through the use of high-capacity tunnel-boring machines and continuous belt conveyor muck haulage

143. Serra da Mesa project, Brazil: excavation of shafts and penstocks

144. Developments in precast concrete tunnel linings in the United Kingdom

145. Construction of the ‘Passante Ferroviario’ link in Milan, Italy, lots 3P, 5P and 6P: excavation by large earth pressure balanced shield with chemical foam injection

146. Pen-Y-Clip road tunnel, North Wales: achieving a dry lining through a pervious rock formation

147. Medway tunnel detailed design

148. Channel tunnel: French undersea crossover design and construction

149. Design and construction of Metsovon road tunnel, Greece

150. Tunnel ring design, development, testing and manufacture for the London Water Ring Main

Catalog

Books, media, physical & digital resources