Search

Your search keyword '"Tuozzolo, Joseph"' showing total 91 results

Search Constraints

Start Over You searched for: Author "Tuozzolo, Joseph" Remove constraint Author: "Tuozzolo, Joseph"
91 results on '"Tuozzolo, Joseph"'

Search Results

51. A Novel Use oF FFAGs in ERLs - in Colliders: eRHIC, LHeC and a Prototype at Cornell University

52. RHIC Au-Au Operation at 100 GeV in Run16

53. Cathode Puck Insertion System Design for the LEReC Photoemission DC Electron Gun

54. DC Photogun Gun Test for RHIC Low Energy Electron Cooler (LEReC)

55. Beam energy scan with asymmetric collision at RHIC

56. HOM Consideration of 704 MHz and 2.1 GHz Cavities for LEReC Linac

57. RF Design of Normal Conducting 704 MHz and 2.1 GHz Cavities for LEReC Linac

58. RF and Mechanical Design of 647 MHz 5-Cell BNL4 Cavity for eRHIC ERL

59. The ERL-based Design of Electron-Hadron Collider eRHIC

60. Mechanical Design and 3-D Coupled RF, Thermal-Structural Analysis of Normal Conducting 704 MHz and 2.1 GHz Cavities for LEReC Linac

61. Observation of Beam-induced Abort Kicker Ferrite Heating in RHIC

62. RHIC Polarized Proton-Proton Operation at 100 GeV in Run 15

63. Update on the CeC POP 704 MHz 5-Cell Cavity Cryomodule Design and Fabrication

64. First Results of the SRF Gun Test for CeC PoP Experiment

65. Design of Normal Conducting 704 MHz and 2.1 GHz Cavities for LEReC Linac

66. Commissioning of the 112 MHz SRF Gun

67. SRF and RF Systems for LEReC Linac

68. Design and Test of the RHIC CMD10 Abort Kicker

69. SRF Gun at BNL: First Beam and Other Commissioning Results

70. First Beam Commissioning at BNL ERL SRF Gun

71. Commissioning of the 112 MHz SRF Gun and 500 MHz Bunching Cavities for the CeC PoP Linac

72. Operation of the RHIC Injector Chain with Ions from EBIS

73. Multipacting-free Quarter-wavelength Choke Joint Design for BNL SRF

74. Apparatus and Technique for Measuring Low RF Resistivity of Tube Coatings at Cryogenic Temperatures

75. RHIC Performance during the 7.5 GeV Low Energy Run in FY 2014

76. Mechanical Design of the 704 MHz 5-cell SRF Cavity Cold Mass for CeC PoP Experiment

77. Small Gap Magnet Prototype Measurements for eRHIC

78. Recent Triplet Vibration Studies in RHIC

80. Multifunction instrument designs with low impedance structures for profile, energy, and emittance measurements for LEReC at BNL

81. First RHIC collider test operation at 2.5gev beam energy

82. RHIC Performance as a 100 GeV Polarized Proton Collider in Run-9

83. Record performance of SRF gun with CsK2Sb photocathode

84. Status of the RHIC HEAD-ON beam-beam compensation project

85. RHIC performance with stochastic cooling for ions and head-on beam-beam compensation for protons

86. Status and Plans for the Polarized Hadron Collider at RHIC

87. LEREC instrumentation design & construction

88. RHIC Polarized Proton Operation for 2013

89. RHIC performance for FY'10 200 GeV Au+Au heavy ion run

90. RHIC performance for FY2014 heavy ion run

91. RHIC performance for fy2012 heavy ion run

Catalog

Books, media, physical & digital resources