87 results on '"Ruwanpura, Janaka"'
Search Results
52. INNOVATIVE FINAL YEAR DESIGN PROJECT-INTERNATIONAL EXPERIENCE MAKES A WORLD OF DIFFERENCE
53. A NOVEL DESIGN COMPETITION FOR THIRD-YEAR CIVIL ENGINEERING STUDENTS
54. THIRD YEAR INTEGRATED DESIGN PROJECT FOR THIRD YEAR CIVIL ENGINEERING STUDENTS
55. Real Time Information Integration via "i-Booth"
56. Automated Multiple Objects Tracking System (AMOTS)
57. An Optimization Model for Dynamic Multi-Project Environment in Construction
58. Why Cost and Schedule Overruns on Mega Oil Sands Projects?
59. Review of the LEED Points Obtained by Canadian Building Projects
60. Stakeholder Views on IT in Construction: A North American Perspective
61. Virtual Supervision in Construction Projects
62. Automated Data Acquisition System to Assess Construction Worker Performance
63. An integrated CAD and simulation model for concrete operations
64. Optimization of Multi-Project Environment (OPMPE)
65. Simulation tool for manpower forecast loading and resource leveling
66. LEED–PDRI Framework for Pre-project Planning of Sustainable Building Projects
67. Situation Based Modeling for Construction Productivity
68. Predicting Schedule and Cost Elements' Variation for EPC Projects in Alberta
69. An analytical method to predict soil types for underground construction operations
70. Prediction models for sewer infrastructure utilizing rule-based simulation
71. Simulation Tool to Select the Most Optimum Route for Pipeline Projects
72. Defining background tasks in SimFC.
73. Rule Based Simulation Models for Sewer Infrastructure
74. Construction Productivity Improvement: A Study of Human, Management and External Issues
75. Developing a general purpose simulation model for steel pipe-rack installation.
76. An integrated CAD and simulation model for concrete operations.
77. Optimization of multi-project environment (OPMPE).
78. Simulation tool for manpower forecast loading and resource leveling.
79. Construction noise prediction and barrier optimization using special purpose simulation.
80. Optimization of traffic signal light timing using simulation.
81. Decision tree module within decision support simulation system.
82. Design, development and application of soil transition algorithms for tunneling using special purpose simulation.
83. Special Purpose Simulation Templates for Tunneling.
84. Bonding Procedures for North American and International Construction Contracts
85. Special purpose simulation template for utility tunnel construction
86. Cost forecast model for sewer infrastructure.
87. Reply to the discussion by J.M. Oswell on 'A review of 41 legal cases involving geotechnical practice in Canada'1.
Catalog
Books, media, physical & digital resources
Discovery Service for Jio Institute Digital Library
For full access to our library's resources, please sign in.