51. Current status of the BAIKAL-GVD project
- Author
-
A. V. Zagorodnikov, T. I. Gress, A. A. Sheifler, A.P. Koshechkin, D.A. Kuleshov, F.K. Koshel, A. V. Shirokov, V.A. Poleshuk, I. A. Belolaptikov, A. A. Perevalov, Konstantin Kebkal, V.B. Brudanin, V.F. Kulepov, Valery Zurbanov, E.N. Pliskovsky, A. V. Skurikhin, A. I. Panfilov, A. M. Klabukov, M.B. Milenin, O.G. Kebkal, S.V. Fialkovsky, O. N. Gaponenko, M.I. Rozanov, O. G. Grishin, V. A. Zhukov, Evgenii V Rjabov, K.V. Golubkov, G.V. Domogatsky, R. R. Mirgazov, I. A. Danilchenko, B. A. Tarashchansky, K. V. Konishchev, N. M. Budnev, V.I. Ljashuk, A.V. Korobchenko, D. A. Petukhov, O. A. Gress, V. A. Kozhin, V.F. Rubtsov, A. S. Yagunov, E.G. Popova, L. A. Kuzmichev, E. A. Osipova, A. Pan'kov, V. M. Aynutdinov, B.A. Shaybonov, A. N. Dyachok, D.Yu. Bogorodsky, Olga Suvorova, L. V. Pankov, A. Pakhorukov, A. A. Doroshenko, Zh.-A.M. Dzhilkibaev, and A.V. Avrorin
- Subjects
Physics ,Current (stream) ,Nuclear and High Energy Physics ,Neutrino detector ,Neutrino telescope ,Systems engineering ,Milestone (project management) ,Astronomy ,Instrumentation ,Technical design - Abstract
We present a status of the Baikal-GVD Project. The objective of this project is a construction of a km3-scale neutrino telescope in the Lake Baikal. As an important milestone, the first GVD engineering array has been deployed and ran in April, 2011. Application of a completely new technology gave us an opportunity to study all the basic elements of the future full detector and to finalize the GVD technical design. We discuss the configuration and the design of the engineering array as well as data performance with the preliminary results.
- Published
- 2013