Search

Your search keyword '"Matthews, David F."' showing total 137 results

Search Constraints

Start Over You searched for: Author "Matthews, David F." Remove constraint Author: "Matthews, David F."
137 results on '"Matthews, David F."'

Search Results

51. Logistics support for Commercial Items and Non-Developmental Items case study : the P-3C Anti-Surface Warfare Improvement Program (AIP)

52. Partnering defense depots with industry for the performance of depot-level maintenance : a case analysis of the AIM XXI program

53. Matrix organizational structure and its effect on Army acquisition program management offices

54. Cost/benefit analysis of interactive courseware

55. Assigning community criticality weights to Marine Corps readiness reportable equipment

56. Integrated concept team utilization in the requirements determination process

57. Case study: an examination of the role of the project manager during the Foreign Military Sale of the Multiple Launch Rocket System to Israel

58. Cost analysis of recapitalizing Marine light attack helicopter assets: a case study

59. The M1 Abrams tank: a case study in major weapon systems acquisition and program management

60. Managerial control of the Army's integrated sustainment maintenance system from a national perspective

61. Analysis of the Army's decision to cease procurement of M1 tank engines

62. Evaluating foreign-source dependencies in U.S. Army missile system production

63. An economic analysis of acquisition opportunities for the United States Department of Defense within the Japanese defense industrial base

64. The Raven Small Unmanned Aerial Vehicle (SUAV), investigating potential dichotomies between doctrine and practice

65. Contractors on the battlefield: a case study of the Airborne Reconnaissance Low (ARL) Life-cycle Logistics Support Contract - March 2000 through August 2001

66. Cost analysis of recapitalizing Marine light attack helicopter assets: a case study

67. Analysis of acquisition workforce responses to recent GAO reports on award and incentive fees

68. The electromagnetic impact of wind turbines

69. The project manager's lieutenant for logistics : a study of the chief logistician's key roles in reducing operation and support costs during developmental programs

70. The M1 Abrams tank: a case study in major weapon systems acquisition and program management

71. Analyzing the Relative Cost, Effectiveness and Suitability of Synchronous Training Versus Traditional On-site Training Approaches.

72. Reducing the logistics footprint in Naval ships through the optimization of Allowance Equipage Lists (AELs)

73. Program Managers' Competencies: a consideration of project management competencies on the specific case of land reserve modernization project at Meaford, Ontario, Canada

74. The XM777 joint lightweight 155mm Howitzer program (LW155): case study in program management considerations concerning the use of national arsenal assets

75. Risk mitigation techniques employed in the remediation contracting process for the environmental cleanup of Fort Ord, California

76. Matrix organizational structure and its effect on Army acquisition program management offices

77. Cost/benefit analysis of interactive courseware

78. Contracting for Life-Cycle Contractor Support for Army tactical missile systems

79. Improving the future of the Army's future combat systems program

80. Analysis of the Sustainment Organization and Process for the Marine Corps RQ-11B Raven Small Unmanned Aircraft System (SUAS)

81. A government user's perspective of testing

82. Assigning community criticality weights to Marine Corps readiness reportable equipment

83. International cooperative research and development between the United States and France, Germany, and the United Kingdom

84. Managerial control of the Army's integrated sustainment maintenance system from a national perspective

85. Analysis of the Army's decision to cease procurement of M1 tank engines

86. Contracted Logistics Support in operational environments: The legal issues and their effects on the decision to outsource

87. Logistics support for Commercial Items and Non-Developmental Items case study : the P-3C Anti-Surface Warfare Improvement Program (AIP)

88. Evaluating foreign-source dependencies in U.S. Army missile system production

89. Application of a network perspective to DoD weapon system acquisition: an exploratory study

90. A comparative analysis of the resources required for test and evaluation on Army-led weapon system programs, based upon program size and acquisition management complexity

91. Case study: an examination of the role of the project manager during the Foreign Military Sale of the Multiple Launch Rocket System to Israel

92. Major Weapon Systems Acquisition and Life Cycle Cost estimation: a case study

93. A unique prototyping concept for missile and aviation weapon systems

94. Acquisition of threat-representative ballistic missile targets

95. Revolutionizing the United States Army's chemical defense through the acquisition of software and software-intensive systems

96. Analysis of the Sustainment Organization and Process for the Marine Corps RQ-11B Raven Small Unmanned Aircraft System (SUAS)

97. Analyzing the Relative Cost, Effectiveness and Suitability of Synchronous Training Versus Traditional On-site Training Approaches

98. Improving the U.S. Navy's execution of technical authority through a common risk management and technical assessment process

99. Impacts and consequences of non-standard cots C4I system acquisition upon associated programs of record

100. The Raven Small Unmanned Aerial Vehicle (SUAV), investigating potential dichotomies between doctrine and practice

Catalog

Books, media, physical & digital resources