751. Long-Run Marginal Cost Pricing Based on Network Spare Capacity.
- Author
-
Furong Li
- Subjects
- *
DIRECT costing , *LONG run (Economics) , *TIME-of-use pricing for electric utilities , *ELECTRIC networks , *ELECTRIC capacity , *ELECTRIC power distribution - Abstract
This paper proposes a novel approach for providing long-run marginal cost (LRMC) pricing in network charges. The proposed approach makes use of the unused capacity of an exiting network to reflect the cost of advancing or deferring future investment consequent upon the perturbation of generation or load at each study node on a distribution or transmission network. Compared with existing approaches to LRMC pricing, the proposed approach produces forward-looking charges that reflect both the extent of the network needed to service the generation and/or load, and the degree to which that network is utilized. [ABSTRACT FROM AUTHOR]
- Published
- 2007
- Full Text
- View/download PDF