1. 港珠澳太桥沉管隧道最终接头合龙施工技术.
- Author
-
吴凤亮, 李家林, 李金峰, and 刘兆权
- Subjects
- *
CONSTRUCTION projects , *TUNNELS , *CONSTRUCTION , *TECHNOLOGY , *WELDING , *IRON & steel building - Abstract
The final joint of the Hongkong—Zhuhai—Macao Bridge immersed tunnel is located between the S8 section of the E29 immersed lube and the SI section of the E30 immersed tube, about 580 m from the head of the East Island, the lowest elevation of the lube bottom is -27.937 m. and the steel shell concrete structure is located in the curve section with a radius of 5 500 m. Its underwater closure welding construction is the most risky subproject in the entire project construction. In order to minimize construction risks and continuously optimize the construction technology, a set of mature and reliable underwater-welding construction plan was found through pre-construction simulation exercises. In the end, the underwater welding task was completed with a one-time welding pass rale of 97.8%, which has made a major contribution to the smooth completion of the Hongkong—Zhuhai-Macao Bridge and created many of the best in the world. [ABSTRACT FROM AUTHOR]
- Published
- 2019
- Full Text
- View/download PDF