1. Methodology for reverse engineering analysis of ITER as-built integrated systems.
- Author
-
Fuentes, F. Javier, Cordier, Jean-Jacques, Leonard, Pierric, Scherrer, Lucas, Wilson, David, Gagueche, Hani, and Popa, Tudorel
- Subjects
- *
REVERSE engineering , *ENGINEERING mathematics , *FUSION reactors , *BUILDING design & construction , *PROCESS optimization , *ACQUISITION of data - Abstract
• Methodology to perform RE activities during ITER construction is presented. It covers the Tokamak Machine and Buildings. • Reverse Engineering implementation workflow is described. • RE activities are implemented and managed in ITER by the As-Built Data management Working Group (ADM-WG). Group organization is described. • RE analysis is a valuable tool for assembly process optimization, interfaces customization and alignment target optimization. • RE methodology is described. The application of RE techniques to the assessment of Vacuum Vessel and Cryostat Base construction is presented. The ITER machine consists of a large number of highly integrated and complex systems, with critical functional positional requirements (e.g. accurate positioning of magnets to minimize error fields and location of plasma facing components with respect to magnetic axis) and reduced design clearances to maximize Tokamak performances and optimize sizing. Deviations from specified part tolerances and product assembly processes/accuracies could have a critical impact on assembly feasibility, schedule and achievement of final performances, compromising plasma operation. The assessment of potential deviations on as-manufactured and as-assembled systems, together with early mitigation of non-compliance with Tokamak dimensional requirements, are critical activities during the ongoing manufacturing and Tokamak construction phases. This paper describes the methodology implemented within ITER for the assessment of as-built integrated systems, based on Reverse Engineering (RE) techniques. It includes the identification of construction needs (at system and assembly levels), the acquisition of metrology data based on defined needs, the post-processing and alignment of data and the reconstruction and management of 3D as-built configuration models. RE techniques are a basic tool for the management of dimensional risk and opportunity for mitigation or recovery during ITER construction phase. ITER is a Nuclear Facility INB-174. This paper describes a Protection Important Activity (PIA) for safety. [ABSTRACT FROM AUTHOR]
- Published
- 2019
- Full Text
- View/download PDF