1. Commissioning of China ADS Demo Linac and Baseline Design of CiADS Project
- Author
-
Huan Jia, Zhijun Wang, Shuhui Liu, Yuan He, Weiping Dou, Weilong Chen, Yuanshuai Qin, and Hongwei Zhao
- Subjects
History ,Engineering ,Project commissioning ,business.industry ,Nuclear engineering ,Beam commissioning ,Linear particle accelerator ,Computer Science Applications ,Education ,Accelerator Physics ,Beam physics ,Room Temperature and Superconducting Linacs ,Baseline (configuration management) ,business ,Beam (structure) - Abstract
China Accelerator Driven Subcritical System (C-ADS) program was launched in China in 2011, which aims to design and build an ADS demonstration facility with the capability of more than 10 MW thermal power in multiple phases lasting about 20 years. In the first phase, a demo linac has been constructed and commissioned successfully to demonstrate the key technologies of the high-power CW mode superconducting linac. Followed the China ADS roadmap, a superconducting driver linac with 500MeV and 5mA proton beam is designed for the second phase of China Initiative Accelerator Driven Subcritical System (CiADS) program. The commissioning results of the China ADS 25 MeV demo linac and the RAMI oriented beam physics design of CiADS linac are presented in this paper., Proceedings of the 14th Int. Conf. on Heavy Ion Accelerator Technology, HIAT2018, Lanzhou, China
- Published
- 2019
- Full Text
- View/download PDF