Search

Your search keyword '"Matthias Thürer"' showing total 48 results

Search Constraints

Start Over You searched for: Author "Matthias Thürer" Remove constraint Author: "Matthias Thürer" Topic 0209 industrial biotechnology Remove constraint Topic: 0209 industrial biotechnology
48 results on '"Matthias Thürer"'

Search Results

1. On the integration of card-allocation and dispatching decisions in POLCA systems: an assessment by simulation

2. Self-Organizing Material Flow Control using Smart Products: An Assessment by Simulation

3. Order Release, Dispatching and Resource Assignment in Multiple Resource Constrained Job Shops:An Assessment by Simulation

4. Production planning and control in multi-stage assembly systems: an assessment of Kanban, MRP, OPT (DBR) and DDMRP by simulation

5. Factors for choosing production control systems in make-to-order shops: a systematic literature review

6. Workload control in additive manufacturing shops where post-processing is a constraint: an assessment by simulation

7. Workload Control order release in general and pure flow shops with limited buffer size induced blocking: an assessment by simulation

8. Direct Workload Control:Simplifying Continuous Order Release

9. Lean manufacturing implementation in regions with scarce resources

10. On the combined effect of due date setting, order release, and output control

11. Lot Synchronization in Make-to-Order Shops with Order Release Control:An Assessment by Simulation

12. The use of finite loading to guide short-term capacity adjustments in make-to-order job shops:An assessment by simulation

13. On the meaning of ConWIP cards: an assessment by simulation

14. On the Use of Blockchain in Industrial Product Service Systems: A critical Review and Analysis

15. Rethinking Jidoka Systems under Automation & Learning Perspectives in the Digital Lean Manufacturing World

16. Digital Twin in Services and Industrial Product Service Systems

17. POLCA: Centralised vs. Decentralised Job Release

18. A systematic review of China’s belt and road initiative:Implications for global supply chain management

19. Workload control in dual-resource constrained high-variety shops: an assessment by simulation

20. Lot splitting under load-limiting order release in high-variety shops: An assessment by simulation

21. Optimal configuration of assembly supply chains based on Hybrid augmented Lagrangian coordination in an industrial cluster

22. Internet of Things-based real-time production logistics synchronization mechanism and method toward customer order dynamics

23. Extending the POLCA production control system with centralized job release

24. New Forms of Gemba Walks and Their Digital Tools in the Digital Lean Manufacturing World

25. POLCA Control in Two-Stage Production Systems

26. Workload control and optimised order release: an assessment by simulation

27. Worker assignment in dual resource constrained assembly job shops with worker heterogeneity: an assessment by simulation

28. Parts feeding in two-stage assembly system:an assessment by simulation

29. Proposal of a Reconfigurability Index Using Analytic Network Process

30. A game theory model based on Gale-Shapley for dual-resource constrained (DRC) flexible job shop scheduling

31. POLC-A:an assessment of POLCA’s authorization element

32. Internet of Things (IoT) driven kanban system for reverse logistics: solid waste collection

33. On the meaning of ‘Waste’: review and definition

34. Improving the logistics of a constant order-cycle kanban system

35. System dynamics analysis for an Internet-of-Things-enabled production logistics system

36. Total Quality Management and Quality Circles in the Digital Lean Manufacturing World

37. IoT-enabled dynamic lean control mechanism for typical production systems

38. Centralised vs. decentralised control decision in card-based control systems:comparing kanban systems and COBACABANA

39. Job sequencing and selection within workload control order release: an assessment by simulation

40. Dual Resource Constrained (DRC) Shops: Literature Review and Analysis

41. On the Beat of the Drum:Improving the Flow Shop Performance of the Drum-Buffer-Rope Scheduling Mechanism

42. Improving performance in POLCA controlled high variety shops: an assessment by simulation

43. Load-Based POLCA: An Assessment of the Load Accounting Approach

44. On the integration of input and output control: Workload Control order release

45. Improving workload control order release: incorporating a starvation avoidance trigger into continuous release

46. Workload Control Release Mechanisms: From Practice Back to Theory Building

47. Optimising Workload Norms: The Influence of Shop Floor Characteristics on Setting Workload Norms for the Workload Control Concept

48. Barriers to digital servitization in French manufacturing SMEs

Catalog

Books, media, physical & digital resources