206 results on '"Tian, Guangdong"'
Search Results
2. An efficient multi-objective adaptive large neighborhood search algorithm for solving a disassembly line balancing model considering idle rate, smoothness, labor cost, and energy consumption
3. Human-Robot Collaboration in Mixed-Flow Assembly Line Balancing under Uncertainty: An Efficient Discrete Bees Algorithm
4. More mixed-integer linear programming models for solving three-stage remanufacturing system scheduling problem
5. Data-driven low-carbon transformation management for manufacturing enterprises: an eco-efficiency perspective
6. Mixed-integer linear programming and composed heuristics for three-stage remanufacturing system scheduling problem
7. Smartphone-based straw incorporation: An improved convolutional neural network
8. A chance-constraint programming approach for a disassembly line balancing problem under uncertainty
9. Multi-response assessment for carbon emission and hardening effect in laser surface quenching
10. Multi-objective optimization of energy-efficient remanufacturing system scheduling problem with lot-streaming production mode
11. Hybrid evolutionary algorithm for stochastic multiobjective disassembly line balancing problem in remanufacturing
12. Environment-oriented disassembly planning for end-of-life vehicle batteries based on an improved northern goshawk optimisation algorithm
13. Energy-time tradeoffs for remanufacturing system scheduling using an invasive weed optimization algorithm
14. Ship schedule recovery with voluntary speed reduction zones and emission control areas
15. Efficient multi-objective metaheuristic algorithm for sustainable harvest planning problem
16. A multi-criteria group-based decision-making method considering linguistic neutrosophic clouds
17. A hybrid genetic algorithm with multiple decoding methods for energy-aware remanufacturing system scheduling problem
18. Accelerated performance optimization of drive axle housings based on the pseudo-damage reservation method
19. Recycling of spent Lithium-ion Batteries: A comprehensive review for identification of main challenges and future research trends
20. A soft-sensor for sustainable operation of coagulation and flocculation units
21. Assessment of the engineering properties, carbon dioxide emission and economic of biomass recycled aggregate concrete: A novel approach for building green concretes
22. A life-cycle integrated model for product eco-design in the conceptual design phase
23. Multi-objective scheduling of priority-based rescue vehicles to extinguish forest fires using a multi-objective discrete gravitational search algorithm
24. An energy-efficient method of laser remanufacturing process
25. Exact and metaheuristic algorithms for the vehicle routing problem with a factory-in-a-box in multi-objective settings
26. Capacitated multi-objective disassembly scheduling with fuzzy processing time via a fruit fly optimization algorithm
27. Modeling and scheduling for remanufacturing systems with disassembly, reprocessing, and reassembly considering total energy consumption
28. A hybrid computational intelligence approach for bioremediation of amoxicillin based on fungus activities from soil resources and aflatoxin B1 controls
29. Implementation of solar energy in smart cities using an integration of artificial neural network, photovoltaic system and classical Delphi methods
30. Statistical optimization, soft computing prediction, mechanistic and empirical evaluation for fundamental appraisal of copper, lead and malachite green adsorption
31. An integrated optimization method for tactical-level planning in liner shipping with heterogeneous ship fleet and environmental considerations
32. An evolutionary-based predictive soft computing model for the prediction of electricity consumption using multi expression programming
33. Scheme selection of design for disassembly (DFD) based on sustainability: A novel hybrid of interval 2-tuple linguistic intuitionistic fuzzy numbers and regret theory
34. Key technology and application analysis of quick coding for recovery of retired energy vehicle battery
35. Impact of emission reduction investments on decisions and profits in a supply chain with two competitive manufacturers
36. Human–Robot Collaboration on a Disassembly-Line Balancing Problem with an Advanced Multiobjective Discrete Bees Algorithm.
37. Comprehensive evaluation of disassembly performance based on the ultimate cross-efficiency and extension-gray correlation degree
38. Dual-objective program and improved artificial bee colony for the optimization of energy-conscious milling parameters subject to multiple constraints
39. An adaptive Lagrangian relaxation-based algorithm for a coordinated water supply and wastewater collection network design problem
40. A hyper-hybrid fuzzy decision-making framework for the sustainable-resilient supplier selection problem: a case study of Malaysian Palm oil industry
41. Cadmium and copper heavy metal treatment from water resources by high-performance folic acid-graphene oxide nanocomposite adsorbent and evaluation of adsorptive mechanism using computational intelligence, isotherm, kinetic, and thermodynamic analyses
42. Evaluation of ship’s green degree using a novel hybrid approach combining group fuzzy entropy and cloud technique for the order of preference by similarity to the ideal solution theory
43. Multi-objective low-carbon disassembly line balancing for agricultural machinery using MDFOA and fuzzy AHP
44. Stochastic multi-objective modelling and optimization of an energy-conscious distributed permutation flow shop scheduling problem with the total tardiness constraint
45. Selection of take-back pattern of vehicle reverse logistics in China via Grey-DEMATEL and Fuzzy-VIKOR combined method
46. A hybrid multi-objective optimization approach for energy-absorbing structures in train collisions
47. Multi-criterion decision making for disassembly line balancing problem
48. Multi-objective disassembly line design and optimisation considering energy efficiency and human factors.
49. Triangular Fuzzy QFD–MCDM Combination Approach for Green Building Design Scheme Evaluation.
50. An asynchronous parallel disassembly planning based on genetic algorithm
Catalog
Books, media, physical & digital resources
Discovery Service for Jio Institute Digital Library
For full access to our library's resources, please sign in.