17 results on '"Syratchev, I."'
Search Results
2. Test facility for investigation of heating of 30 GHz accelerating structure imitator for the CLIC project
3. Design Study of a High-Power Ka-Band High-Order-Mode Multibeam Klystron.
4. Modeling of Coupled Cell Output Structures for the Klystrons.
5. RF power source for the compact linear collider test facility (CTF3).
6. Development of frequency-tunable FEM-oscillator with Bragg resonator for testing high-gradient accelerating structures.
7. High RF power production for CLIC.
8. 30 GHz high-gradient accelerating structure test results.
9. 30 GHz Power Production in CTF3.
10. Considerations on the Design of the Decelerator of the CLIC Test Facility (CTF3).
11. Microwave components for 30 GHz high-power gyroklystron.
12. 3 GHz Barrel Open Cavity (BOC) RF pulse compressor for CTF3.
13. Demonstration of high-gradient acceleration.
14. Time domain simulations of the CLIC PETS (power extraction and transfer structure) with GdfidL.
15. Slotted-iris structure studies.
16. 30 GHz High Power Production for CLIC
17. Status of CIEMAT work on PETS
Catalog
Books, media, physical & digital resources
Discovery Service for Jio Institute Digital Library
For full access to our library's resources, please sign in.