Search

Your search keyword '"Ali Allahverdi"' showing total 120 results

Search Constraints

Start Over You searched for: Author "Ali Allahverdi" Remove constraint Author: "Ali Allahverdi" Search Limiters Full Text Remove constraint Search Limiters: Full Text
120 results on '"Ali Allahverdi"'

Search Results

1. Malachite green dye removal with aluminosilicate nanopowder from aluminum dross and silicomanganese slag

2. Hydration and Engineering Properties of Mechanically-Activated Composite Cement from Processed Steel Slag and Limestone

3. More effective heuristics for a two-machine no-wait flowshop to minimize maximum lateness

4. An algorithm for a no-wait flowshop scheduling problem for minimizing total tardiness with a constraint on total completion time

5. Mortar Properties Improvement by Using Fine Portland Cement Clinker as Reactive Aggregate

6. Sulfate resistance of RFCC spent catalyst-blended Portland cement

7. STOCHASTIC MODELING OF COMPRESSIVE STRENGTH OF PHOSPHORUS SLAG CONTENT CEMENT

8. ALKALI-ACTIVATION KINETICS OF PHOSPHORUS SLAG CEMENT USING COMPRESSIVE STRENGTH DATA

9. Synthesis of nanosilica from silica fume using an acid-base precipitation technique and PVA as a nonionic surfactant

10. EFFECTIVENESS OF TRIETHANOLAMINE ON GRINDABILITY AND PROPERTIES OF PORTLAND CEMENT IN LABORATORY BALL AND VIBRATING DISK MILLS

11. AN EXPERIMENTAL INVESTIGATION ON IMPROVING THE MEDIUM AND LATE-AGE COMPRESSIVE STRENGTHS OF CLASS G OIL WELL CEMENT

13. EFFECTS OF BLAST-FURNACE SLAG ON NATURAL POZZOLAN-BASED GEOPOLYMER CEMENT

14. Two-machine flowshop scheduling problem to minimize makespan or total completion time with random and bounded setup times

16. An algorithm for a no-wait flowshop scheduling problem for minimizing total tardiness with a constraint on total completion time

17. Industrial and Management Systems Engineering Program Assessment Based on the New ABET Student Outcomes

18. An Improved Algorithm for Minimizing Makespan on Flowshops with Uncertain Processing Times

19. Highly efficient green synthesis of highly pure microporous nanosilica from silicomanganese slag

20. Minimizing total completion time for flowshop scheduling problem with uncertain processing times

21. Minimizing total completion time in a two-machine no-wait flowshop with uncertain and bounded setup times

22. Properties of Green, Lightweight, and High-Strength Reactive Powder Concrete Incorporating Modified Expanded Polystyrene Beads

24. Green template-free synthesis and characterization of mesoporous alumina as a high value-added product in aluminum black dross recycling strategy

25. Chemical doping of TiO2 Nano-tube array for enhancing hydrogen production through photoelectrochemical water splitting

26. Hazardous aluminum dross characterization and recycling strategies: A critical review

27. Two-machine no-wait flowshop scheduling problem with uncertain setup times to minimize maximum lateness

28. No-wait flowshop scheduling problem with two criteria; total tardiness and makespan

29. Investigating photocatalytic property of TiO 2 nanorods fabricated hydrothermally at equal molar ratio of <scp>KOH</scp> and Na <scp>OH</scp>

30. Production of nanostructured γ-alumina from aluminum foundry tailing for catalytic applications

31. A promising green process for synthesis of high purity activated-alumina nanopowder from secondary aluminum dross

32. Pilot-scale valorization of hazardous aluminum dross into γ-Al2O3 nanoadsorbent for efficient removal of fluoride

33. Performance evaluation of foaming agents in cellular concrete based on foamed alkali-activated slag

34. Algorithms for minimizing the number of tardy jobs for reducing production cost with uncertain processing times

35. A survey of scheduling problems with no-wait in process

36. Scheduling in manufacturing systems: new trends and perspectives

37. Enhancing Concrete Properties by Using Silica Fume as Reactive Powder and Portland Cement-Clinker as Reactive Aggregate

38. A better dominance relation and heuristics for Two-Machine No-Wait Flowshops with Maximum Lateness Performance Measure

39. Calorimetric study of geopolymer binders based on natural pozzolan

40. Two-stage assembly scheduling problem for minimizing total tardiness with setup times

41. STOCHASTIC MODELING OF COMPRESSIVE STRENGTH OF PHOSPHORUS SLAG CONTENT CEMENT

42. Acid-Resistant Geopolymer Based on Fly Ash–Calcium Aluminate Cement

43. A composite cement of high magnesium sulphate resistance

44. Alkali-Activated Phosphorous Slag Performance under Different Curing Conditions: Compressive Strength, Hydration Products, and Microstructure

46. The third comprehensive survey on scheduling problems with setup times/costs

47. ALKALI-ACTIVATION KINETICS OF PHOSPHORUS SLAG CEMENT USING COMPRESSIVE STRENGTH DATA

48. No-Wait Flowshops to Minimize Total Tardiness with Setup Times

49. Enhanced alumina recovery from secondary aluminum dross for high purity nanostructured γ-alumina powder production: Kinetic study

50. Durability of Geopolymer Mortar Based on Waste-Glass Powder and Calcium Aluminate Cement in Acid Solutions

Catalog

Books, media, physical & digital resources