1. Offshore Urban Extension of the Anse Du Portier In Monaco
- Author
-
Pierre Aristaghes and David Compte
- Subjects
Offshore construction ,Extension (metaphysics) ,Oceanography ,Caisson ,Submarine pipeline ,Geology - Abstract
As part of the Monaco offshore urban extension project, Bouygues TP is in charge of design & build a maritime infrastructure as the first step of the six-hectare expansion of the city into the sea. This maritime infrastructure consists of a fill enclosed by a band of trapezoid concrete caissons and will serve as base for construction of the new residential area. The paper focuses on some of the problems which had to be solved: optimization of promenade level and wave absorbing chambers in conjunction with minimal reflection and safety related to overtopping, accounting for sea level rise and correlation between extreme waves and water levels. caissons and rubble mound foundation stability related to waves and seism, including extra seismic forces due to buildings considering the high reclamation height and the immediate proximity of building foundations. the way in which caissons representing nearly 80,000 m3 of concrete can be built in a floating and continuous manner via a caisson box (or "caissonnier" in French), within a particularly short time frame presence of a small craft harbor with shops along the quays, whose location was fixed for urbanistic reasons, which requested optimizations in detail of anti-overtopping devices as much as possible integrated in the urban context, need to convert a breakwater caisson into a low crested swimming pool caisson, with plexiglas windows exposed to wave slamming from outside, but also from inside due to overtopping impacts over the swimming pool basin. Ecodesign has been closely associated with hydrodynamic and coastal engineering, based on estimation of wave pressures and induced velocities in the different possible locations (chambers, walls, structures toes …). The eco-friendly development strategy is based on the wide-scale deployment of a range of 11 solutions which will be described (potential for caissons to be colonized, nursery function development, etc…). Moreover, posidonia transplantation has been done via concrete open boxes, whose stability under storm waves has requested CFD calculations to model local velocities and optimize their shape.
- Published
- 2021
- Full Text
- View/download PDF