1. Workshop on guidelines and methods for the design and evaluation of rebuilding plans for category 1-2 stocks (WKREBUILD2)
- Author
-
Albertsen, Christoffer Moesgaard, Balestri, Elena, Bartolino, Valerio, Campbell, Andrew, Cardinale, Massimiliano, Cerviño, Santiago, Cole, Harriet, Coull, Kenny, Curtis, David, Fall, Johanna, Fallon, Niall, Farrell, Edward D., Garcia, Dorleta, Gerritsen, Hans, Goñi, Nicolas, Green, Karen, Haase, Stefanie, Hintzen, Niels, Hommik, Kristiina, Howell, Daniel, Kelly, Ruth, Kempf, Alexander, Kristinsson, Kristján, Levontin, Polina, Mosqueira, Iago, Nash, Richard, Ourens, Rosana, Pastoors, Martin, Rodríguez, Inés, Sparrevohn, Claus Reedtz, Steiner, Noa, Taylor, Marc, Thiess, Mary, Trijoulet, Vanessa, Vicente, Luís, Villanueva, Maria Ching, Wilson, Ashley, Winker, Henning, Albertsen, Christoffer Moesgaard, Balestri, Elena, Bartolino, Valerio, Campbell, Andrew, Cardinale, Massimiliano, Cerviño, Santiago, Cole, Harriet, Coull, Kenny, Curtis, David, Fall, Johanna, Fallon, Niall, Farrell, Edward D., Garcia, Dorleta, Gerritsen, Hans, Goñi, Nicolas, Green, Karen, Haase, Stefanie, Hintzen, Niels, Hommik, Kristiina, Howell, Daniel, Kelly, Ruth, Kempf, Alexander, Kristinsson, Kristján, Levontin, Polina, Mosqueira, Iago, Nash, Richard, Ourens, Rosana, Pastoors, Martin, Rodríguez, Inés, Sparrevohn, Claus Reedtz, Steiner, Noa, Taylor, Marc, Thiess, Mary, Trijoulet, Vanessa, Vicente, Luís, Villanueva, Maria Ching, Wilson, Ashley, and Winker, Henning
- Abstract
A first workshop on guidelines and methods for the design and evaluation of rebuilding plans for category 1-2 stocks, WKREBUILD, took place in 2020. WKREBUILD generated a guidance on best practices for evaluation of rebuilding plans against potential criteria of acceptability. However, it did not propose specific rebuilding plans or harvest control rules (HCRs). Instead, the workshop recommended that a follow-up workshop be organized for testing the guidelines with actual test cases, with the aim of defining more specific criteria and guidelines. Thus, the main objective of WKREBUILD2 was to propose performance indicators and thresholds for the implementation and acceptability of rebuilding plans and a framework for the integration of rebuilding advice rules within the ICES advice framework. To facilitate the evaluation of rebuilding plans a simulation tool was developed. The tool is based on FLR libraries and the application to specific cases is facilitated through a template consistent with TAF (Transparent Assessment Framework) and ensures an easy integration of the analysis into the ICES TAF system. The tool was tested in three specific case studies, Celtic Sea Whiting, Western Horse Mackerel and Western Baltic Herring. The application to the case studies served to validate the tool and to provide the science base to propose operational performance thresholds and criteria for the evaluation and implementation of rebuilding strategies in ICES. WKREBUILD2 proposes to use BPA as the entry point to the rebuilding phase and MSY Btrigger as the exit point. Once a stock is estimated to be below BPA in the last assessment year, stock specific rebuilding strategies should be tested by means of simulations, preferably using the WKREBUILD2 simulation tool as the performance of HCRs are dependent on depletion rate and life history. The harvest control rule that fulfils the rebuilding criteria could then be selected to provide headline catch advi
- Published
- 2023