Search

Your search keyword '"May, A.D."' showing total 63 results

Search Constraints

Start Over You searched for: Author "May, A.D." Remove constraint Author: "May, A.D." Publisher institute of transport studies, university of leeds Remove constraint Publisher: institute of transport studies, university of leeds
63 results on '"May, A.D."'

Search Results

1. Project FATIMA Final Report: Part 1

2. Project FATIMA Final Report: Part 2

3. Towards The Sustainable City: The Impact Of Transport-Land Use Interactions, Deliverable 6. The Final Report

4. PROJECT OPTIMA: optimisation of policies for transport integration in metropolitan areas

5. An Investigation Into the Effects of Various Transport Policies on the Levels of Motorised Traffic in Great Britain in 2006

6. Priority Management for Urban Arterials. Transferability of Techniques: Otley/Kirkstall Road

7. Priority Management for Urban Arterials. Transferability of Techniques: Hypothetical Arterials

8. Priority Management for Urban Arterials. Transferability of Techniques: Methodology and Summary

9. Priority Management for Urban Arterials. Transferability of Techniques: Humberstone/Uppingham Road

10. Priority Management for Urban Arterials. Transferability of Techniques: York/Selby Road

11. The Optimisation of Integrated Urban Transport Strategies: Tests Based on Edinburgh

12. Area Speed-Flow Relationships by Micro-Simulation: Sensitivity Issues and Problems with the Tracking Approach When Extended to Multi-Zone Networks

13. House of Commons Select Committee on Transport: Inquiry into Urban Congestion Charging

14. An Investigation of Area Speed Flow\ud Relationships by Micro-Simulation Single Links

15. Area Speed Flow Relationships by Micro-\ud Simulation: Grid Networks

16. The Optimisation of Integrated Urban Transport Strategies: Tests Using Pluto

17. Further Studies of the Distributional Effects of\ud Road Pricing

18. Modelling the Network Effects of Road User Charging: Results from a SATURN Study

20. The Distributional Impact of Various Road Charging Schemes for London

21. Queue Management Project Model: Strategies for the Management of Queues at Upstream Junctions

22. The Development of a Common Investment Appraisal for Urban Transport Projects

23. Road Pricing: The Potential for Comparative Monitoring. A Report to the London Planning Advisory Committee

24. Objective Monitoring of the Benefits of\ud Dynamic Route Guidance: Survey Methodology

25. Integrated Transport Strategies: A New Initiaitve, or a Return to the 1960’s?

26. Travel Demand Growth: Research on Longer-Term Issues. The Potential Contribution of Trip Planning Systems

27. Determination of Priorities for Footway Reconstruction

28. Counting Methods and Sampling Strategies Determining Pedestrian Numbers

29. Control of Congestion in Highly Saturated Networks: Working Paper 251 – Experimental Results and Conclusions

30. Ergonomic Standards for Disabled People in Pedestrian Areas : Results from Leeds Observation Work 1988/89

31. Travel Time Variability of a Group\ud of Car Commuters in North London

32. The Impact of Transport Problems on Inner\ud City Firms: Summary Report

33. The Influence of Town Centre Conditions on Pedestrian Trip Behaviour: Results from a Household Survey in\ud Two Locations

34. New Approaches to Traffic Management Solution – With Reference to Sowerby Bridge

35. Car Sharing and Peak Spreading Studies in Sheffield: Final Report

36. Transport and Inner City Firms: Results of\ud the Leeds Surveys

37. Effects of Bans on Heavy Lorries in\ud London: Impacts on Manufacturing & Service Industries

38. Factors Affecting Travel Times on Urban Radial Routes

39. The Impact of Transport Problems on Inner\ud City Firms: A Review

40. Pedestrian Amenity: Testing the Coventry Model

41. The Effects of Wheel Clamps in Central London:\ud Comparison of Before and After Studies

42. Transport and Inner City Firms: Results of the\ud London Surveys

43. Studies of Pedestrian Amenity

44. Travel Time Monitoring in Urban Areas – Survey Design

45. Control of Congestion at Highly Saturated\ud Signalised Intersections: Experiments on Rama 4 Road, Bangkok

46. Pedestrian Amenity: On Street Survey Design

47. Development of a Cycling Policy for York Technical Report

48. Work Journey Rescheduling – Model\ud Development Analysis

49. Identifying Traffic Problems in a Heavily Trafficked Urban Environment– Reference to Sowerby\ud Bridge

50. Ergonomic standards for pedestrian areas for disabled people: literature review and consultations

Catalog

Books, media, physical & digital resources