39 results on '"Tian, Guangdong"'
Search Results
2. An Enhanced Social Engineering Optimizer for Solving an Energy-Efficient Disassembly Line Balancing Problem Based on Bucket Brigades and Cloud Theory
3. How to Determine an Optimal Noise Subspace?
4. A Hybrid QFD-Based Human-Centric Decision Making Approach of Disassembly Schemes Under Interval 2-Tuple q-Rung Orthopair Fuzzy Sets
5. Knowledge-Based Lot-Splitting Optimization Method for Flexible Job Shops Considering Energy Consumption
6. Interval-Valued Intuitionistic Uncertain Linguistic Cloud Petri Net and Its Application to Risk Assessment for Subway Fire Accident
7. Multistage Impact Energy Distribution for Whole Vehicles in High-Speed Train Collisions: Modeling and Solution Methodology
8. Multiobjective Bike Repositioning in Bike-Sharing Systems via a Modified Artificial Bee Colony Algorithm
9. Fuzzy Grey Choquet Integral for Evaluation of Multicriteria Decision Making Problems With Interactive and Qualitative Indices
10. Economic Maintenance Planning of Complex Systems Based on Discrete Artificial Bee Colony Algorithm
11. Design of Reverse Logistics Network for Remanufacturing Waste Machine Tools Based on Multi-Objective Gray Wolf Optimization Algorithm
12. Big-Data-Based Power Battery Recycling for New Energy Vehicles: Information Sharing Platform and Intelligent Transportation Optimization
13. Target Disassembly Sequencing and Scheme Evaluation for CNC Machine Tools Using Improved Multiobjective Ant Colony Algorithm and Fuzzy Integral
14. Modeling and Planning for Dual-Objective Selective Disassembly Using and/or Graph and Discrete Artificial Bee Colony
15. A Data-Driven-Based Wavelet Support Vector Approach for Passenger Flow Forecasting of the Metropolitan Hub
16. Flexible Process Planning and End-of-Life Decision-Making for Product Recovery Optimization Based on Hybrid Disassembly
17. An Integrated Multi-Criteria Decision Making Approach to Location Planning of Electric Vehicle Charging Stations
18. Dual-Objective Program and Scatter Search for the Optimization of Disassembly Sequences Subject to Multiresource Constraints
19. AHP, Gray Correlation, and TOPSIS Combined Approach to Green Performance Evaluation of Design Alternatives
20. Disassembly Sequence Planning Considering Fuzzy Component Quality and Varying Operational Cost
21. On Tchebycheff Decomposition Approaches for Multiobjective Evolutionary Optimization
22. Multiobjective Program and Hybrid Imperialist Competitive Algorithm for the Mixed-Model Two-Sided Assembly Lines Subject to Multiple Constraints
23. Coordinated Control Algorithm of a Dual Motor for an Electric Variable Transmission Hybrid System
24. Random Energy-Efficient Models for Sustainable Facility Location Subject to Carbon Emission, Economical, Capacitated and Regional Constraints
25. Balancing Problem of Stochastic Large-Scale U-Type Assembly Lines Using a Modified Evolutionary Algorithm
26. Energy-Efficiency Models of Sustainable Urban Transportation Structure Optimization
27. Random Fuzzy Cost-Profit Equilibrium Model for Locating a Discrete Service Enterprise
28. Determining Truth Degrees of Input Places in Fuzzy Petri Nets
29. Big Data Analytics for System Stability Evaluation Strategy in the Energy Internet
30. Energy Control Strategy of HEB Based on the Instantaneous Optimization Algorithm
31. A Cyber-Physical System for Product Conceptual Design Based on an Intelligent Psycho-Physiological Approach
32. Dual-Objective Scheduling of Rescue Vehicles to Distinguish Forest Fires via Differential Evolution and Particle Swarm Optimization Combined Algorithm
33. Disassembly Sequence Optimization for Large-Scale Products With Multiresource Constraints Using Scatter Search and Petri Nets
34. Multiobjective Optimization Models for Locating Vehicle Inspection Stations Subject to Stochastic Demand, Varying Velocity and Regional Constraints
35. Stochastic Cost-Profit Tradeoff Model for Locating an Automotive Service Enterprise
36. Energy-Efficient Models of Sustainable Location for a Vehicle Inspection Station With Emission Constraints
37. A Chance Constrained Programming Approach to Determine the Optimal Disassembly Sequence
38. Probability Evaluation Models of Product Disassembly Cost Subject to Random Removal Time and Different Removal Labor Cost
39. Addressing a Collaborative Maintenance Planning Using Multiple Operators by a Multi-Objective Metaheuristic Algorithm_supp1-3269059.docx
Catalog
Books, media, physical & digital resources
Discovery Service for Jio Institute Digital Library
For full access to our library's resources, please sign in.