Search

Showing total 839 results

Search Constraints

Start Over You searched for: Topic engineering Remove constraint Topic: engineering Topic forensic engineering Remove constraint Topic: forensic engineering Publisher american society of civil engineers Remove constraint Publisher: american society of civil engineers
839 results

Search Results

1. Theme Paper: Earthquake Engineering for Tunnels and Underground Structures. A Case History

2. Progress toward a Unified Thrust Restraint Design—An Update

3. On the Creep Reduction Factors for Geotextile Puncture Protection of Geomembranes

4. Editor’s Note.

5. Application of the Observation Method for Scour to Two Texas Bridges

6. Wisdom of Ancient Engineering Practice in China

7. Editor's Note.

8. Geo-Risk 2017

9. Detailed Analysis of the Causes of Bridge Fires and Their Associated Damage Levels

10. Limitations of Grundy and Kabaila s Simplified Method and Its Repercussion on the Safety and Serviceability of Successively Shored Building Structures

11. State-of-the-Art Blast-Resistant Design of Airports: Innovative Analytical Methodologies and Tools

12. PIANC Guidelines: Oil and Petrochemical Terminal Design

13. Overcoming the Challenges of Fixing a Displaced Wharf

14. Designing, Permitting, and Constructing Resilient Structures

15. Alternative Asphalt Concrete Pavement Design Methods at the Port of Los Angeles

16. Seismic Risk Management in the New Zealand Context

17. Evaluation and Remediation of Pre-Northridge Steel Moment Frame Column Splices

18. Make Way for Progress—The Challenges of Relocating Large Diameter Water Mains for Light Rail System Expansion

19. Pipe Bursting Asbestos Cement Pipe: The Process Is Established but What’s Next

20. Hot Tapping and Plugging Procedures Enable Replacement of Concrete Pressure Pipelines Reaching the End of Service Life without Service Interruption

21. Repairing the World’s Largest Prestressed Concrete Pipe: A Case Study of the Central Arizona Project's Centennial Wash Siphon

22. Structural Damage and Defects in Wind Farm Towers: Typical Examples, Practical Repairs, and Unresolved Questions

23. Removable Compressive Load Distributive Strand Anchors: Case History and Lessons Learned

24. Risk Analysis on Bridge Scour Failure

25. Extending the Service Life of Historic Terra Cotta Roofing with Fluid-Applied Waterproofing Membranes

26. Survey of Stair Construction Codes in New York City

27. Service Life Extension Option for Large-Diameter Potable-Water Transmission Pipelines

28. A Cautionary Tale about Unextended Proprietary Restrained Joints for Ductile Iron Pipe

29. CFRP Renewal of PCCP: An Overview

30. Flange Joints: Avoiding Installation Pitfalls

31. Analysis of a 60-In. PCCP that Failed without Warning from Acoustic Fiber Optic System

32. Rehabilitation of the Second Lower Feeder

33. Large-Diameter Steel Water Pipe: Comparing Classic and Recent Design Procedures for External Earth Loads

34. Risk of GRP Panel Failure During Installation in Sewers When Using Relining Technology

35. Foam Concrete-Based Soft Ground Arresting System for Runways

36. Reflective Cracking on Cement Treated Base (CTB) Pavements in Zambia: An Analytical Study

37. Performance-Based, Blast-Resistant and Seismic Design of Reinforced Concrete Buildings in Industrial and Petrochemical Facilities

38. Lessons Learned: How Changes in Code, Construction and Preparedness Affected Tornado Damage in Moore, Oklahoma, 1999 to 2013

39. Evaluation and Rating of Masonry Arch Bridges

40. Graphitization Effects on High Temperature Ductwork

41. Traffic Function Loss of Highway Lifelines during Major Natural Disasters

42. Correlation Analysis of Driver Factors to Traffic Accident Severity

43. Study on the Lining Design Methods for the Trenchless Rehabilitation of Urban Water Mains

44. Evaluation of Harm Effect Distances after High-Pressure Natural Gas Pipeline Leakage

45. Discussions on the Application of the Pipe Bursting Method for Pipeline Rehabilitation

46. Mechanical Response Analysis of Pipeline under the Action of Floods

47. Seismic Design of the Uniform Wharf in Guam

48. Replacement of Tsunami-Damaged Crescent City Marina

49. Performance of Port and Harbor Structures Impacted by the March 11, 2011 Great Tohoku Earthquake & Tsunami

50. What if We Don't? An Economic View of Seismic Upgrade