ELECTRIC power distribution, MUNICIPAL corporations, FEASIBILITY studies
Abstract
Focuses on the failure to adopt city ownership of electric distribution system in Berkeley, California. Need for models of local and regional control over natural resources in Berkeley; Information on study of the feasibility of municipal power, conducted by conservationist, Walter Packard; Reasons for the failure of the electric distribution policy.
Published
1973
Discovery Service for Jio Institute Digital Library
For full access to our library's resources, please sign in.