1. Analysis Of Offshore Platforms Lifting With Fixed Pile Structure Type (Fixed Platform) Based On ASD89.
- Author
-
Sugianto, Agus and Indriani, Andi Marini
- Subjects
- *
OFFSHORE construction contracts , *STRAINS & stresses (Mechanics) , *PETROLEUM prospecting , *PILES & pile driving , *STRUCTURAL analysis (Engineering) - Abstract
Platform construction GTS (Gathering Testing Sattelite) is offshore construction platform with fix pile structure type/fixed platform functioning to support the mining of petroleum exploitation. After construction fabrication process platform was moved to barges, then shipped to the installation site. Moving process is generally done by pull or push based on construction design determined when planning. But at the time of lifting equipment/cranes available in the work area then the moving process can be done by lifting so that moving activity can be implemented more quickly of work. This analysis moving process of GTS platform in a different way that is generally done to GTS platform types by lifting using problem is construction reinforcement required, so the construction can be moved by lifting with analyzing and checking structure working stress that occurs due to construction moving process by lifting AISC code standard and analysis using the SAP2000 structure analysis program. The analysis result showed that existing condition cannot be moved by lifting because stress ratio is above maximum allowable value that is 0.950 (AISC-ASD89). Overstress occurs on the member 295 and 324 with stress ratio value 0.97 and 0.95 so that it is required structural reinforcement. Box plate aplication at both members so that it produces stress ratio values 0.78 at the member 295 and stress ratio of 0.77 at the member 324. These results indicate that the construction have qualified structural reinforcement for being moved by lifting. [ABSTRACT FROM AUTHOR]
- Published
- 2017
- Full Text
- View/download PDF