82 results on '"emplacement"'
Search Results
2. Performance Demonstration Program Plan for Nondestructive Assay for the TRU Waste Characterization Program (Rev. 2)
3. Excess plutonium disposition: The deep borehole option
4. Measurement of source tube radial position in cast EMC testbeam module
5. The advantages of a salt/bentonite backfill for Waste Isolation Pilot Plant disposal rooms
6. 10-MWe solar-thermal central-receiver pilot plant, solar facilities design integration: collector-field optimization report (RADL item 2-25)
7. Release rates in a salt repository by diffusion
8. Calculation of the inventory and near-field release rates of radioactivity from neutron-activated metal parts discharged from the high flux isotope reactor and emplaced in solid waste storage area 6 at Oak Ridge National Laboratory
9. Permeability of granular beds emplaced in vertical drill holes
10. Transient high speed gas flow in a gravel stemming column. [BANDICOOT Event]
11. Limitation on resonant extraction due to random field errors in the ES/D magnets at FNAL. [Energy saver/doubler (ES/D)]
12. Stemming options and their effect on containment
13. High level waste canister emplacement and retrieval concepts study
14. Effectiveness of layered stemming in comparison with homogeneous stemming
15. Design aspects of the Alpha Repository: VI. Selection and cost analysis of large hole drilling equipment
16. Argus glass laser target alignment system
17. Sample positioning effects in x-ray spectrometry
18. Radioactive waste isolation in salt: Peer review of the Fluor Technology, Inc. , report and position paper concerning waste emplacement mode and its effect on repository conceptual design
19. Conceptual designs for waste packages for horizontal or vertical emplacement in a repository in salt for reference in the site characterization plan
20. Site characterization plan conceptual design report for a high-level nuclear waste repository in salt, vertical emplacement mode: Volume 1
21. Steady-state radionuclide transfer from a cylinder intersected by a fissure
22. Project Rio Blanco: detonation related activities. Final report
23. XE-1 element placement and orificing summary report
24. Parametric analysis of NR.1 flight shield configuration
25. Project Cowboy. Completion report
26. Fuel element hole location survey
27. Preoperational checkout of the remote-handled transuranic waste handling at the Waste Isolation Pilot Plant
28. Subseabed disposal program annual report, January-September 1981. Volume II. Appendices (principal investigator progress reports). Part 2
29. Report of the Fourth interim meeting of the Seabed Working Group Engineering Studies Task Group, 3-6 October 1983, at Rijks Geologische Dienst, Haarlem, The Netherlands
30. Summary of structural evaluation and design support for the underground nuclear test program. Final report, June 1978-July 1979
31. Continuation of static tests of segments of tunnel linings. Volume II data. Final report 21 Nov 77-30 Jun 79
32. Demonstration plan and demonstration procedure for the contact-handled (CH) transuranic (TRU) waste mock retrieval demonstration
33. Development and field placement of an expansive salt-saturated concrete (ESC) for the Waste Isolation Pilot Plant (WIPP). Final report
34. High-frequency seismic-source characteristics of cavity-decoupled underground nuclear explosions. Technical report No. 1, 22 March 1987-22 March 1988
35. Geological Survey investigations in connection with the Mighty Epic event, U12n. 10 tunnel, Nevada Test Site
36. Spherically symmetric numerical simulation of the SRI grout spheres containment experiments. Topical report 1 Jan-31 Oct 78
37. Three-point anchoring in the deep ocean
38. Logistics characterization for regional spent fuel repositories concept
39. Test plan: Small scale seal performance tests
40. Thread wear evaluation for 7'' and 9-5/8'' O. D. (outside diameter) casing conducted at the Nevada Test Site: Engineering report
41. Test plan appendix: WIPP simulated RH TRU waste add-on tests (Additional rock mechanics and waste package performance)
42. Collector-field layout specification (RADL Item 2-12)
43. A thermomechanical analysis of WIPP (Waste Isolation Pilot Plant) DHLW (Defense High Level Waste) experiments: Waste container/borehole interactions
44. Central-receiver solar-thermal power system. Collector subsystem quarterly technical progress report
45. Ocean Thermal Energy Conversion (OTEC) Programmatic Environmental Analysis. Volume 2. Appendices
46. Economic analysis of the unified heliostat array
47. Implications of one-year basalt weathering/reactivity study for a basalt repository environment
48. Report of the third interim meeting of the Seabed Working Group, Engineering Studies Task Group, 6-9 July 1982 at University of Cambridge, Cambridge, England, United Kingdom Engineering Studies Task Group
49. Southwestern Public Service Company Solar Repowering Program. Technical progress report No. 3, December 3-31, 1979
50. Analysis of the effect of orientation of a buried hemispherical excavation on the surrounding stress distribution
Catalog
Books, media, physical & digital resources
Discovery Service for Jio Institute Digital Library
For full access to our library's resources, please sign in.