94 results on '"Lars Mönch"'
Search Results
2. Exact and Heuristic Algorithms for a bi-criteria Order-Lot Pegging Problem in a Multi-Fab Setting.
3. Data-Driven Production Planning Formulations with Inventory Considerations.
4. Scheduling Jobs in Flexible Flow Shops with s-batching Machines Using Metaheuristics.
5. A Planning Model for Incorporating Renewable Energy Sources into Semiconductor Supply Chains.
6. Scheduling Jobs with Uncertain Ready Times on a Single Batch Processing Machine.
7. Learning Dispatching Rules for Energy-Aware Scheduling of Jobs on a Single Batch Processing Machine.
8. Impact of Production Planning Approaches on Wafer Fab Performance During Product Mix Changes.
9. Production-Level Artificial Intelligence Applications in Semiconductor Manufacturing.
10. Simulation-Based Performance Assessment of Sustainable Manufacturing Decisions.
11. Data-Driven Production Planning Formulations For Wafer Fabs: A Computational Study.
12. Design and Application of an Ontology for Demand Fulfillment in Semiconductor Supply Chains.
13. Scheduling and Simulation in wafer fabs: Competitors, Independent Players or Amplifiers?
14. Integrating Critical Queue Time Constraints Into SMT2020 Simulation Models.
15. Heuristics for Order-Lot Pegging In Multi-Fab Settings.
16. Fast Heuristics for Making Qualification Management Decisions in Wafer Fabs.
17. A New High-Volume/Low-Mix Simulation Testbed for Semiconductor Manufacturing.
18. Integrated Planning of Production and Engineering Activities in Semiconductor Supply Chains: A Simulation Study.
19. Problem Reduction Approaches for Production Planning Using Clearing Functions.
20. Simulation-based Performance Assessment of Tool Requalification Strategies in Wafer Fabs.
21. Electricity Power Cost-Aware Scheduling of jobs on Parallel batch Processing Machines.
22. A Hierarchical Approach to Qualification Management in wafer fabs.
23. Simulation-based optimiziation to design equipment health-aware dispatching rules.
24. Incorporating elements of a sustainable and distributed generation system into a production planning model for a wafer fab.
25. Designing an Ontology for Agent-Based Planning and Control Tasks in Semiconductor Supply Chains.
26. S2CMAS: An Agent-Based System for Planning and Control in Semiconductor Supply Chains.
27. Simulation-based optimization for integrated production planning and capacity expansion decisions.
28. An optimization model for qualification management in wafer fabs.
29. Using simulation to improve planning decisions in mixed-model assembly lines.
30. Simulation-based performance assessment of production planning formulations for semiconductor wafer fabrication.
31. Simulation of low-volume mixed model assembly lines: modeling aspects and case study.
32. A decomposition heuristic for a two-machine flow shop with batch processing.
33. Reliable Service Reconfiguration for Time-Critical Service Compositions.
34. Towards an Ontology for Small Series Production.
35. Application of Intelligent Service Bus in a Ramp-up Production Context.
36. A comparison of production planning formulations with exogenous cycle time estimates using a large-scale wafer fab model.
37. A heuristic to support make-to-stock, assemble-to-order, and make-to-order decisions in semiconductor supply chains.
38. A Conceptual Architecture Based on Intelligent Services for Manufacturing Support Systems.
39. Tactical Service Selection with Runtime Aspects.
40. Cost-Minimizing Service Selection in the Presence of End-to-End QoS Constraints and Complex Charging Models.
41. Design and Implementation of a Service-based Scheduling Component for Complex Manufacturing Systems.
42. Variable neighborhood search-based subproblem solution procedures for a parallel shifting bottleneck heuristic for complex job shops.
43. An exploratory study of a decomposition heuristic for complex shop scheduling with transportation.
44. Heuristiken zur multikriteriellen Komposition von Dienstenin dienstbasierten Informationssystemen.
45. Scheduling jobs with time constraints between consecutive process steps in semiconductor manufacturing.
46. Using iterative simulation to incorporate load-dependent lead times in master planning heuristics.
47. Dynamic Service Selection with End-to-End Constrained Uncertain QoS Attributes.
48. iCoMAS: An Agent-Based System for Cooperative Transportation Planning in the Food Industry.
49. A comparison of heuristics to solve a single machine batching problem with unequal ready times of the jobs.
50. Towards a supply chain simulation reference model for the semiconductor industry.
Catalog
Books, media, physical & digital resources
Discovery Service for Jio Institute Digital Library
For full access to our library's resources, please sign in.