This paper discusses the main drawbacks and enhancements experienced with the design and start up of two full-scale UASB plants in Brazil. The topics addressed are related to blockage of inlet pipes, scum accumulation, seed sludge for the start-up, corrosion and gas leakage, odour generation and sludge management. The paper describes the main improvements achieved. [ABSTRACT FROM AUTHOR]
The paper evaluates and models helminth eggs removal in a combined UASB (Upflow Anaerobic Sludge Blanket) reactor -- maturation pond system (one baffled and one unbaffled pond in parallel). The system is comprised of demonstration-scale units, treating actual domestic sewage from Itabira city, Brazil. The paper addresses the following points: (i) removal of helminth eggs from the wastewater in the system; (ii) comparison of the observed removal efficiency with the predictions using the Ayres et al. model; (iii) accumulation of helminth eggs in the sludge; (iv) viability of eggs in the sludge; (v) distribution of helminth species in the sludge. The removal efficiency of helminth eggs from the wastewater in both ponds was 100% for most of the time (0 counts in the final effluent). The predictions of helminth eggs removal according to the Ayres et al. model can be considered reasonable. After one year of operation, 88% of the eggs in the sludge remained viable. Helminth eggs counts in the sludge tended to decrease along the baffled pond length (from first to last compartment). The prevailing helminth species found in the sludge from both ponds was Ascaris lumbricoides. [ABSTRACT FROM AUTHOR]