Search

Your search keyword '"Mitchell, Neil"' showing total 49 results

Search Constraints

Start Over You searched for: Author "Mitchell, Neil" Remove constraint Author: "Mitchell, Neil" Journal ieee transactions on applied superconductivity Remove constraint Journal: ieee transactions on applied superconductivity
49 results on '"Mitchell, Neil"'

Search Results

1. Acceptance Test of Pre-Compression Rings for ITER Magnet System

2. Completion and Factory Acceptance Test of the ITER PF1 Coil

4. ITER CS Module Test Facility Operational Lessons From CS Modules 1–4

5. Analysis of the Leakage Events in the Thermal Shield Cooling Pipes of the ITER Magnet System

7. Mitigation Plans for Insulation Failures and Arcing in the ITER Magnets

9. Factory Acceptance Test and Delivery of the First Two Poloidal Field Coils to ITER Fusion Facility

11. About the first 6 toroidal field coils and 2 poloidal field coils completed by EU for ITER

13. Preparation of the ITER Central Solenoid Assembly

14. Toward Completion and Delivery of the First EU ITER Magnets

15. F4E Procurement of the Pre-Compression Rings Made of Pultruded Composite Material

17. Coupling current loss

18. Interstrand contact resistances

19. Mechanical properties

21. Manufacture of the ITER Central Solenoid Components

22. Magnet Infrastructure Facilities for ITER (MIFI): Description and Activities Overview

25. Qualification Program of Lap Joints for ITER Coils

27. Design and Qualification of Joints for ITER Magnet Busbar System

28. Status and Qualification Test of Feeder Main Busbar Joint for ITER Magnet System.

30. ITER Central Solenoid Insert Test Results

35. From Design to Development Phase of the ITER Correction Coils

36. Test of a 10 kA HTS Current Lead for ITER

37. Progress in Design, Analysis, and Manufacturing Studies of the ITER Feeders.

38. Status of ITER Conductor Development and Production.

39. Status of Design and R&D for the ITER Feeder System Procurement in China.

40. Structural Analysis of ITER Magnet Feeders.

41. High Voltage Test of ITER Feeder Components Under Paschen Condition.

42. Design of the HTS Current Leads for ITER.

43. Status of the ITER Manufacturing Database for the Magnet System Procurement.

44. Qualification Phase of Key Technologies for ITER Correction Coils.

45. Performance Analysis of the ITER Poloidal Field Coil Conductors.

46. R&D Towards HTS Current Leads for ITER.

47. Installation and Test Programme of the ITER Poloidal Field Conductor Insert (PFCI) in the ITER Test Facility at JAEA Naka.

48. Simulation of Quench Tests of the Central Solenoid Insert Coil in the ITER Central Solenoid Model Coil.

49. Quench Detection Using Pick-Up Coils for the ITER Central Solenoid.

Catalog

Books, media, physical & digital resources