1. BIM-based benchmarking system for healthcare projects: Feasibility study and functional requirements
- Author
-
Daniel P. de Oliveira, Jiyong Choi, and Fernanda Leite
- Subjects
Integrated project delivery ,Computer science ,business.industry ,020209 energy ,0211 other engineering and technologies ,Functional requirement ,02 engineering and technology ,Building and Construction ,Schedule (project management) ,Benchmarking ,Data flow diagram ,Engineering management ,Building information modeling ,Control and Systems Engineering ,021105 building & construction ,0202 electrical engineering, electronic engineering, information engineering ,Use case ,Performance indicator ,business ,Civil and Structural Engineering - Abstract
While project benchmarking based on key performance indicators is regarded as a crucial technique for mature project delivery in the construction industry, incorporating it into an organization's routine is a cumbersome and time-consuming endeavor as it entails considerable time and human efforts for collecting and providing project information, and validating the quality of collected data. To overcome this challenge, this paper introduces an approach that leverages Building Information Modeling (BIM), which allows for a more streamlined benchmarking process. The approach presented in this paper focuses on healthcare projects which have been benchmarked using a comprehensive set of cost, schedule, dimension, and planning performance metrics through a mature sector-specific benchmarking program at Construction Industry Institute (CII). As an initial step in the formulation of such a tool, this paper investigates the potential of leveraging BIM for benchmarking through close scrutiny of contents embedded in real-world models collected from six healthcare projects. Functional requirements were, then, established to realize a BIM-based benchmarking tool for healthcare projects by developing conceptual process flow, use cases, and data flow diagrams. The requirements are further illustrated in mock-ups of a prototype system.
- Published
- 2018