52 results on '"JUN HO LEE"'
Search Results
2. An empirical study of success factors in Korea's game industry.
3. A Resource Allocation Problem with Convex Resource-Dependent Processing Times Under A Two-Machine Flow Shop Environment.
4. Deep Reinforcement Learning With a Look-Ahead Search for Robotic Cell Scheduling.
5. Cycle Planning for Concurrent Processing in a Dual-Armed Cluster Tool.
6. The Impact of Processing Time Variations on Swap Sequence Performance in Dual-Armed Cluster Tools.
7. Reinforcement learning for robotic flow shop scheduling with processing time variations.
8. Single-machine scheduling with energy generation and storage systems.
9. Scheduling of step-improving jobs with an identical improving rate.
10. Scheduling of Dual-Gripper Robotic Cells With Reinforcement Learning.
11. TeethVib: Monitoring Teeth Functional Occlusion Through Retainer Vibration Sensing.
12. Iterative job splitting algorithms for parallel machine scheduling with job splitting and setup resource constraints.
13. Cyclic robot scheduling for 3D printer-based flexible assembly systems.
14. An Exploratory Study on the Benefit Sharing of Broadcasting Content Industry.
15. Backward Sequence Analysis for Single-Armed Cluster Tools.
16. Performance evaluation of flow lines with non-identical and unreliable parallel machines and finite buffers.
17. Analysis of Backward Sequence for Single-Armed Cluster Tools With Processing Time Variations.
18. Learning from Data with Noisy Labels Using Temporal Self-Ensemble.
19. Completion Time Analysis for Automated Manufacturing Systems with Parallel Processing Modules.
20. Closed-Form Expressions on Lot Completion Time for Dual-Armed Cluster Tools With Parallel Processing Modules.
21. Three-machine flow shop scheduling with overlapping waiting time constraints.
22. Robot task sequencing for a flexible assembly system with 3D printers.
23. Uniform Parallel Machine Scheduling with Dedicated Machines, Job Splitting and Setup Resources.
24. Development of DEM-MBD coupling model for draft force prediction of agricultural tractor with plowing depth.
25. Dilute Polymerization of Aniline on PDMS Substrate via Surface Modification Using (3-Aminopropyl)Triethoxysilane for Stretchable Strain Sensor.
26. Analysis of the Effect of Tillage Depth on the Working Performance of Tractor-Moldboard Plow System under Various Field Environments.
27. Improvement in Strain Sensor Stability by Adapting the Metal Contact Layer.
28. Serial Production Lines With Waiting Time Limits: Bernoulli Reliability Model.
29. Completion Time Analysis of Wafer Lots in Single-Armed Cluster Tools With Parallel Processing Modules.
30. Makespan computation of lot switching period in single-armed cluster tools.
31. Scheduling uniform parallel dedicated machines with job splitting, sequence-dependent setup times, and multiple servers.
32. Schedulability Analysis for Noncyclic Operation of Time-Constrained Cluster Tools With Time Variation.
33. A programmable acoustic stimuli and auditory evoked potential measurement system for objective tinnitus diagnosis research.
34. Breath Acetone Measurement-Based Prediction of Exercise-Induced Energy and Substrate Expenditure.
35. Locally Controlled Sensing Properties of Stretchable Pressure Sensors Enabled by Micro-Patterned Piezoresistive Device Architecture.
36. Noncyclic Scheduling of Cluster Tools With a Branch and Bound Algorithm.
37. Time-Feasible Reachability Tree for Noncyclic Scheduling of Timed Petri Nets.
38. Scheduling timed Petri nets with a time-feasible reachability tree.
39. A petri net-based modeling and scheduling with a branch and bound algorithm.
40. Scheduling a wet station using a branch and bound algorithm.
41. Scheduling transient periods of single-armed cluster tools.
42. Iteration algorithms for performance evaluation and buffer design of Bernoulli serial lines with waiting time constraints.
43. Concurrent processing of multiple wafer types in a single-armed cluster tool.
44. An open scheduling architecture for cluster tools.
45. Scheduling Cluster Tools for Concurrent Processing of Two Wafer Types.
46. Non-Cyclic Scheduling of a Wet Station.
47. A study on regenerative breaking energy on electric multiple unit train.
48. Scheduling Cluster Tools With Ready Time Constraints for Consecutive Small Lots.
49. Simple alignment procedure for a VNIR imaging spectrometer with a Shack-Hartmann wavefront sensor and a field identifier.
50. Kinematic optimal design of a paramill: A multi-SP device.
Catalog
Books, media, physical & digital resources
Discovery Service for Jio Institute Digital Library
For full access to our library's resources, please sign in.