Search

Your search keyword '"Albajar, F."' showing total 54 results

Search Constraints

Start Over You searched for: Author "Albajar, F." Remove constraint Author: "Albajar, F." Database Unpaywall Remove constraint Database: Unpaywall
54 results on '"Albajar, F."'

Search Results

2. Lessons learned after three years of SPIDER operation and the first MITICA integrated tests

3. Tests and Qualification of the European 1 MW, 170 GHz CW Gyrotron in an ITER relevant configuration at SPC

4. European 1 MW, 170 GHz CW Gyrotron Prototype for ITER - long-pulse operation at KIT -

6. Enhanced operation of the Eu Ec test facility

7. Tests and developments of a long-pulse high-power 170 GHz absorbing matched load

8. Recent experiments with the European 1MW, 170GHz industrial CW and short-pulse gyrotrons for ITER

10. Experimental verification of the European 1 MW, 170 GHz industrial CW prototype gyrotron for ITER

11. CW Experiments With the EU 1-MW, 170-GHz Industrial Prototype Gyrotron for ITER at KIT

12. Progress of The Experiments With the European 1Mw, 170Ghz Industrial Cw Prototype Gyrotron For Iter

13. Numerical studies on the influence of cavity thermal expansion on the performance of a high-power gyrotron

14. First CW experiments with the EU ITER 1 MW, 170 GHz industrial prototype gyrotron

15. Experimental Results of the EU ITER Prototype Gyrotrons

16. Status and experimental results of the European 1 MW, 170 GHz industrial CW prototype Gyrotron for ITER

17. Status of Europe’s contribution to the ITER EC system

20. Progress on the development of the EU-1 MW gyrotron for ITER

21. From series production of gyrotrons for W7-X towards EU-1 MW gyrotrons for ITER

22. From series production of gyrotrons for W7-X towards EU-1 MW gyrotrons for ITER

23. Design of the EU-1MW gyrotron for ITER

25. High voltage power supplies for ITER RF heating and current drive systems

27. Overview of the ITER EC H&CD system and its capabilities

28. AN OVERVIEW OF THE ITER EC TRANSMISSION LINE

29. THE ITER EC H&CD SYSTEM

30. The CRONOS suite of codes for integrated tokamak modelling

32. An overview of the ITER electron cyclotron H&CD system

33. Progress on the heating and current drive systems for ITER

34. Progress in design and integration of the ITER Electron Cyclotron H&CD system

36. REVIEW OF THE EUROPEAN PROGRAMME FOR THE DEVELOPMENT OF THE GYROTRON FOR ITER

37. A REVISED ITER EC SYSTEM BASELINE DESIGN PROPOSAL

39. FIRST EXPERIMENTAL RESULTS FROM THE EU 2 MW COAXIAL CAVITY ITER GYROTRON PROTOTYPE

40. First Experimental Results from the European Union 2-MW Coaxial Cavity ITER Gyrotron Prototype

42. ECRH System For ITER

43. Status of development of the 2MW, 170GHz coaxial-cavity gyrotron for ITER

45. Status of development of the 2MW, 170GHz coaxial-cavity gyrotron for ITER

46. The European 2MW, 170GHz coaxial cavity gyrotron for ITER

Catalog

Books, media, physical & digital resources