6 results on '"Spross, Johan"'
Search Results
2. Probabilistic Time Estimation of Tunneling Projects: The Uri Headrace Tunnel
3. Principles of Risk-Based Rock Engineering Design
4. On the Need for a Risk-Based Framework in Eurocode 7 to Facilitate Design of Underground Openings in Rock
5. Using Observational Method to Manage Safety Aspects of Remedial Grouting of Concrete Dam Foundations
6. On the observational method for groundwater control in the Northern Link tunnel project, Stockholm, Sweden
Catalog
Books, media, physical & digital resources
Discovery Service for Jio Institute Digital Library
For full access to our library's resources, please sign in.