130 results on '"Thorndahl, L."'
Search Results
2. Developments of the Palmer pickup tank for stochastic cooling in the CR
3. Developments for the CR Stochastic Cooling System
4. Stochastic cooling of bunched ions simulated in the time domain
5. Developments for the CR stochastic cooling system
6. Progress of the stochastic cooling system of the Collector Ring
7. Design of the Palmer pickup for stochastic pre-cooling of heavy ions in the CR
8. The Stochastic Cooling System of HESR
9. Beam Dynamics and First Operation of the Sub-Harmonic Bunching System in the CTF3 Injector
10. Stochastic Cooling Electrodes for a Wide Velocity Rangel in the CR
11. CTF3 drive-beam injector design
12. CTF3 design report
13. CLIC: a Two-Beam Multi-TeV $e^{\pm}$ Linear Collider
14. A 3 TeV $e^+ e^-$ Linear Collider Based on CLIC Technology
15. Design of a 3 GHz Accelerator Structure for the CLIC Test Facility (CTF 3) Drive Beam
16. CLIC, a Multi-TeV $e^{\pm}$ Linear Collider
17. CLIC, a Multi-TeV e+ linear collider
18. PETS Output Power and Drive Beam Deceleration for Finite Q-Values and Tune Errors
19. The CLIC Study of a Multi-TeV $e^\pm$ Linear Collider
20. The CLIC study of a multi-TeV e± linear collider
21. Loss factor Dependence on Group Velocity in Disk-Loaded Travelling-Wave Structures
22. The 30 GHz transfer structure for the CLIC study
23. Demonstration of two-beam and 30 GHz power production in the CLIC test facility
24. The CLIC re power source not yet available
25. Demonstration of two-beam acceleration in CTF II
26. CLIC, a 0.5 to 5 TeV e$^{\pm}$ Compact Linear Collider
27. Drive Beam Generation For CLIC Based On 200 MHz SC Structures
28. Push-pull Linac pairs to generate two drive beams for CLIC multibunch operation
29. Push-Pull Pairs To Generate Two Drive Beams For CLIC MuItibunch Operation
30. Results from the CLIC Test Facility
31. Two 352 MHz push-pull linac pairs to generate two drive beams for CLIC multibunch operation
32. Results with the CTF in 1995: a summary
33. Drive beam bunchlet trains for multibunching
34. Beam loading compensation and 30 GHz power requirement for multibunching
35. Two independent linacs for the generation of the CLIC drive beams
36. Multibunching in CLIC based on 30 GHz power recirculation
37. Long range longitudinal wakes in a 3 GHz inflector structure for the CLIC drive beam isochronous ring
38. Progress with the CLIC transfer structures (CTS)
39. CLIC drive beam generation a feasibility study
40. Adiabatic bunching in an isochronous storage ring by horizontal rf deflection
41. 30 GHz longitudinal wake and compressed output pulse of the CLIC transfer structure (CTS)
42. Multi-frequency acceleration for the CLIC drive linac with beam loading and HOM compensation
43. CLIC drive beam away days
44. A multi-frequency preacceleration system for the CLIC drive linac with beam loading compensation
45. The CERN antiproton accumulator complex (AAC): current status and operation for the nineties
46. Impedance and loss factor measurements on a CLIC transfer structure (CTS)
47. A multi-frequency reacceleration system for the CLIC drive linac with beam loading compensation
48. High intensity options for the CERN heavy ion programme
49. Antiproton accumulator complex (AAC) performance
50. Non-destructive diagnostics of coasting beams with schottky noise
Catalog
Books, media, physical & digital resources
Discovery Service for Jio Institute Digital Library
For full access to our library's resources, please sign in.