Search

Your search keyword '"Proth, Jean-Marie"' showing total 35 results

Search Constraints

Start Over You searched for: Author "Proth, Jean-Marie" Remove constraint Author: "Proth, Jean-Marie" Database Gale General OneFile Remove constraint Database: Gale General OneFile
35 results on '"Proth, Jean-Marie"'

Search Results

1. Algorithms for partitioning of large routing networks

2. Minimizing the number of machines for minimum length schedules

3. Scheduling in supply chain environment

4. Insertion of a random task in a schedule: a real time approach

5. The 0--1 outcomes feature selection problem: a [chi].sup.2 approach

6. The concave cost supply problem

7. Optimization of cyclic production systems: a heuristic approach

8. A survey of the state of the art of common due date assignment and scheduling research

9. The cutting stock problem with mixed objectives: two heuristics based on dynamic programming

10. A continuous model for supply planning of assembly systems with stochastic component procurement times

11. Supplier selection problem for a single manufacturing unit under stochastic demand

12. Supplier selection problem for a single manufacturing unit under stochastic demand

14. Scheduling of piecewise constant product flows: a Petri net approach

15. Cyclic scheduling of a hoist with time window constraints

16. Heuristic for unrelated machine scheduling with precedence constraints

17. Management of a pool of self-service cars

18. A class of Petri nets for manufacturing system integration

19. Optimization of the number of transportation devices in a flexible manufacturing system using event graphs

20. Heuristic approaches for n/m/F/sigma Ci scheduling problems

21. Single machine scheduling with chain structured precedence constraints and separation time windows

22. Analysis of a supply chain partnership with revenue sharing

23. Analysis of a supply chain partnership with revenue sharing

24. Heuristic procedure for minimizing makespan and the number of required pallets

25. Cycle time of stochastic event graphs: evaluation and marking optimization

27. Predictive maintenance: the one-unit replacement model

28. Efficient heuristic and optimal approaches for n/2/F/sigma Ci scheduling problems

29. Inventory control of repairable tools with incomplete information

30. Existence of forecast horizons in undiscounted discrete-time lot size models

31. Supply chains: measure, evaluation and specific risks

32. Scheduling No-Wait Production with Time Windows and Flexible Processing Times

34. 2011 IFORS Triennial Conference in Melbourne

35. Editorial

Catalog

Books, media, physical & digital resources