Search

Showing total 30 results
30 results

Search Results

1. Branch-and-Price Based Heuristic Algorithm for Fuzzy Multi-Depot Bus Scheduling Problem.

2. Research on Solving Postdisaster Material Distribution and Scheduling with Improved NSGA-II Algorithm.

3. Single machine Pareto scheduling with positional deadlines and agreeable release and processing times.

4. An Improved Branch-and-Bound Algorithm for the One-Machine Scheduling Problem with Delayed Precedence Constraints.

5. Applications of Lagrangian relaxation-based algorithms to industrial scheduling problems, especially in production workshop scenarios: A review.

6. AN EFFECTIVE NEW HEURISTIC ALGORITHM FOR SOLVING PERMUTATION FLOW SHOP SCHEDULING PROBLEM.

7. On the weak computability of a four dimensional orthogonal packing and time scheduling problem.

8. Task and Participant Scheduling of Trading Platforms in Vehicular Participatory Sensing Networks.

9. New closed-loop approximate dynamic programming for solving stochastic decentralized multi-project scheduling problem with resource transfers.

10. Makespan minimization for two parallel machines with an unavailable period on each machine.

11. Scheduling co-operating stacking cranes with predetermined container sequences.

12. Algorithms for no-wait flowshops with total completion time subject to makespan.

13. Minimizing cycle time in single machine scheduling with start time-dependent processing times.

14. A hybrid metaheuristic for concurrent layout and scheduling problem in a job shop environment.

15. On flowshop scheduling problems with the aging effect and resource allocation.

16. New results on single-machine scheduling with past-sequence-dependent delivery times

17. Optimal algorithms for online scheduling with bounded rearrangement at the end

18. On-line machine covering on two machines with local migration

19. A note on optimization in deteriorating systems using scheduling problems with the aging effect and resource allocation models

20. Pareto-based discrete artificial bee colony algorithm for multi-objective flexible job shop scheduling problems.

21. NNMA: An effective memetic algorithm for solving multiobjective permutation flow shop scheduling problems

22. A hybrid algorithm based on particle swarm optimization and simulated annealing for a periodic job shop scheduling problem.

23. Robust metaheuristics for group scheduling with sequence-dependent setup times in hybrid flexible flow shops.

24. Algorithms for special cases of the single machine total tardiness problem and an application to the even–odd partition problem

25. An Improved Timed Elastic Band (TEB) Algorithm of Autonomous Ground Vehicle (AGV) in Complex Environment.

26. Travel Time Reliability-Based Rescue Resource Scheduling for Accidents Concerning Transport of Dangerous Goods by Rail.

27. Speedup Learning for Repair-based Search by Identifying Redundant Steps.

28. An Improved Rapidly-Exploring Random Trees Algorithm Combining Parent Point Priority Determination Strategy and Real-Time Optimization Strategy for Path Planning.

29. Multi-User Scheduling for 6G V2X Ultra-Massive MIMO System.

30. A GRASP Approach for Solving Large-Scale Electric Bus Scheduling Problems.