Search

Showing total 129 results

Search Constraints

Start Over You searched for: Search Limiters Available in Library Collection Remove constraint Search Limiters: Available in Library Collection Topic construction projects Remove constraint Topic: construction projects Publisher vilnius gediminas technical university Remove constraint Publisher: vilnius gediminas technical university
129 results

Search Results

1. INCENTIVE MECHANISMS OF AN EXPERIMENTAL RESOURCE-SHARING PLATFORM CONSIDERING REPUTATION EFFECTS FOR MEGAPROJECTS.

2. RESOURCE LEVELLING IN REPETITIVE CONSTRUCTION PROJECTS WITH INTERRUPTIONS: AN INTEGRATED APPROACH.

3. AUTOMATIC IDENTIFICATION AND QUANTIFICATION OF SAFETY RISKS EMBEDDED IN DESIGN STAGE: A BIM-ENHANCED APPROACH.

4. EFFECT OF RELATIONSHIP MANAGEMENT ON CONSTRUCTION PROJECT SUCCESS DELIVERY.

5. RISK CAUSATION MODEL TO CAPTURE AND TRANSFER KNOWLEDGE IN INTERNATIONAL CONSTRUCTION PROJECTS.

6. USING GROWTH CURVES MODEL TO ANALYSE THE PROSPECTS OF CHINA-PAKISTAN OIL AND LNG TRANSPORTATION CORRIDOR.

7. THE APPLICATION OF BIM IN THE AECO INDUSTRY.

8. ANALYSIS OF CONSTRUCTION PRODUCTIVITY BASED ON CONSTRUCTION DURATION PER FLOOR AND PER GROSS AREA, WITH IDENTIFICATION OF INFLUENTIAL FACTORS.

9. AN EVIDENCE-BASED RISK DECISION SUPPORT APPROACH FOR METRO TUNNEL CONSTRUCTION.

10. CYBERSECURITY ASSESSMENT OF BIM/CDE DESIGN ENVIRONMENT USING CYBER ASSESSMENT FRAMEWORK.

11. AN INTEGRATED FUZZY DEMATEL-FUZZY ANP MODEL FOR EVALUATING CONSTRUCTION PROJECTS BY CONSIDERING INTERRELATIONSHIPS AMONG RISK FACTORS.

12. DRAWING INSPIRATION FROM THE SPINE, DESIGNING A PEDESTRIAN BRIDGE [SPINE-INSPIRED DESIGN OF A PEDESTRIAN BRIDGE].

13. EXPERIMENTAL AND NUMERICAL STUDY ON COLUMN-FOUNDATION CONNECTION THROUGH EXTERNAL SOCKET.

14. RESILIENCE-COST TRADEOFF SUPPLY CHAIN PLANNING FOR THE PREFABRICATED CONSTRUCTION PROJECT.

15. Effect of relationship management on construction project success delivery

16. FACTORS CAUSING REWORK AND THEIR IMPACT ON PROJECTS' PERFORMANCE IN EGYPT.

17. SCIENTOMETRIC REVIEW OF CONSTRUCTION PROJECT SCHEDULE STUDIES: TRENDS, GAPS AND POTENTIAL RESEARCH AREAS.

18. A MODEL FOR EVALUATING CAUSES OF WASTES AND LEAN IMPLEMENTATION IN CONSTRUCTION PROJECTS.

19. GOVERNMENT SUBSIDIES IN PUBLIC-PRIVATE PARTNERSHIP PROJECTS BASED ON ALTRUISTIC THEORY.

20. ASSESSMENT OF CHANGE ORDER IMPACT FACTORS ON CONSTRUCTION PROJECT PERFORMANCE USING ANALYTIC HIERARCHY PROCESS (AHP).

21. FORECASTING OF SPORTS FIELDS CONSTRUCTION COSTS AIDED BY ENSEMBLES OF NEURAL NETWORKS.

22. THE ECONOMIC RELEVANCE OF ON-SITE CONSTRUCTION ACTIVITIES WITH THE EXTERNAL THERMAL INSULATION COMPOSITE SYSTEM (ETICS).

23. FANPCE TECHNIQUE FOR RISK ASSESSMENT ON SUBWAY STATION CONSTRUCTION.

24. A DECISION SUPPORT MODEL FOR CIVIL ENGINEERING PROJECTS BASED ON MULTI-CRITERIA AND VARIOUS DATA.

25. EXAMINING ASSOCIATION BETWEEN CONSTRUCTION INSPECTION GRADES AND CRITICAL DEFECTS USING DATA MINING AND FUZZY LOGIC.

26. DECISION-MAKING MODEL SUPPORTING THE PROCESS OF PLANNING EXPENDITURES FOR RESIDENTIAL BUILDING RENOVATION.

27. CONSTRUCTION SAFETY RISK ASSESSMENT WITH INTRODUCED CONTROL LEVELS.

28. EVALUATION OF CRITICAL SUCCESS FACTORS FOR CONSTRUCTION PROJECTS - AN EMPIRICAL STUDY IN LITHUA.

29. THE PUBLIC SECTOR'S PERSPECTIVE ON PROCURING PUBLIC WORKS PROJECTS - COMPARING THE VIEWS OF PRACTITIONERS IN HONG KONG AND AUSTRALIA.

30. FACTORS AFFECTING THE PERFORMANCE OF CONSTRUCTION PROJECTS IN THE GAZA STRIP.

31. SIMULATION MODELLING CONSTRUCTION PROJECT WITH REPETITIVE TASKS USING PETRI NETS THEORY.

32. TIME BUFFERS IN CONSTRUCTION PROCESS SCHEDULING.

33. Application of the EVM method and its extensions in the implementation of construction objects.

34. COGNITION DRIVEN FRAMEWORK FOR IMPROVING COLLABORATIVE WORKING IN CONSTRUCTION PROJECTS: NEGOTIATION PERSPECTIVE.

35. SUBCONTRACTOR SELECTION PRACTICES IN INTERNATIONAL CONSTRUCTION PROJECTS.

36. RISK ASSESSMENT OF CONSTRUCTION PROJECTS.

37. EXPLORING CRITICAL SUCCESS FACTORS FOR STAKEHOLDER MANAGEMENT IN CONSTRUCTION PROJECTS.

38. MODEL FOR INTEGRATED PROJECT MANAGEMENT.

39. A CHECKLIST FOR ASSESSING SUSTAINABILITY PERFORMANCE OF CONSTRUCTION PROJECTS.

40. MANAGERIAL OPPORTUNITIES IN APPLICATION OF BUSINESS INTELLIGENCE IN CONSTRUCTION COMPANIES.

41. DECENTRALIZED SYSTEM FOR CONSTRUCTION PROJECTS DATA MANAGEMENT USING BLOCKCHAIN AND IPFS.

42. BLOCKCHAIN OF OPTIMAL MULTIPLE CONSTRUCTION PROJECTS PLANNING UNDER PROBABILISTIC ARRIVAL AND STOCHASTIC DURATIONS.

43. MANAGERIAL MEASURES TO REDUCE REWORK AND IMPROVE CONSTRUCTION SAFETY IN A DEVELOPING COUNTRY: MALAYSIAN CASE.

44. CRITICAL FACTORS INFLUENCING INVENTORY AND PROCUREMENT SYSTEM OF INFRASTRUCTURE PROJECTS.

45. SELECTING HIGH PRIORITY ACTIVITIES FOR THE REALLOCATION OF RESOURCES TO REDUCE CONSTRUCTION DURATION.

46. SCHEDULING REPETITIVE CONSTRUCTION PROJECTS: STRUCTURED LITERATURE REVIEW.

47. QUANTITATIVE VIEW ASSESSMENT (QUVIAS) METHOD FOR WINDOW VISIBILITY ANALYSIS UTILIZING BIM, GIS AND WEB ENVIRONMENTS.

48. CAUSES AND EFFECTS OF POOR COMMUNICATION IN THE CONSTRUCTION INDUSTRY IN THE MENA REGION.

49. Evaluation of critical success factors for construction projects – an empirical study in Lithuania

50. UNDERSTANDING THE CHANGES IN CONSTRUCTION PROJECT MANAGERS' COMPETENCES THROUGH RESUME DATA MINING.